•Releases the REVERSE
•Does PLC (Programmable Logic Controller) input L.E.D. (light emitting diode) #18 go “OFF”?
•If the answers to these question are “YES”, wiring to the PLC (Programmable Logic Controller) is correct.
If any answer to these questions is “NO”, refer to Probable Causes paragraph below
•Tumbler (Basket) Forward Switch - PB1
For quick check of the wiring of PB1 to the PLC (Programmable Logic Controller) perform the following test with the control voltage “ON”. (“GREEN” Button)
•Press the FORWARD
•Does PLC (Programmable Logic Controller) input L.E.D. (light emitting diode) #17 light?
•Releases the REVERSE
•Does PLC (Programmable Logic Controller) input L.E.D. (light emitting diode) #17 go “OFF”?
•If the answer to these question are “YES,” wiring to the PLC (Programmable Logic Controller) is correct. If any answer to these questions is “NO,” refer to Probable Causes paragraph below:
a)PROBABLE CAUSES;
1a) Fuse #4 on Main Electrical Panel
2a) Faulty Switches
3a) Wiring back to the PLC (Programmable Logic Controller)
b)POSSIBLE SOLUTIONS;
1b) Check fuse blown indicator on Fuse #4; replace fuse, if necessary and retest.
2b) Check switches using an OHM meter; replace if necessary, and retest.
3b) Refer to
•
•
WIRING DIAGRAM
89