Maytag W10240584B, W10240585B-SP, MGDE200XW INStall Vent System, Install Leveling Legs

Page 12

Determine vent length and elbows needed for best drying performance:

■■ Use following Vent system chart to determine type of vent material and hood combinations acceptable to use.

NOTE: Do not use vent runs longer than those specified in Vent system chart.

Exhaust systems longer than those specified will: ■■ Shorten life of dryer.

■■ Reduce performance, resulting in longer drying times and increased energy usage.

The Vent system chart provides venting requirements that will help achieve best drying performance.

NOTE: Side and bottom exhaust installation have a 90° turn inside the dryer. To determine maximum exhaust length, add on 90° turn to the chart.

Vent system chart

 

Number of

Type

Box/louvered

Angled

 

 

90° elbows

of vent

hoods

hoods

 

 

 

 

 

 

 

 

0

Rigid metal

64 ft. (20 m)

58 ft. (17.7 m)

 

 

 

 

 

 

 

 

1

Rigid metal

54 ft. (16.5 m)

48 ft. (14.6 m)

 

 

 

 

 

 

 

 

2

Rigid metal

44 ft. (13.4 m)

38 ft. (11.6 m)

 

 

 

 

 

 

 

 

3

Rigid metal

35 ft. (10.7 m)

29 ft. (8.8 m)

 

 

 

 

 

 

 

 

4

Rigid metal

27 ft. (8.2 m)

21 ft. (6.4 m)

 

 

 

 

 

 

 

 

 

 

 

 

 

INStall VENT SYSTEM

1. Install exhaust hood

12" min.

(305 mm)

12" min. (305 mm)

Install exhaust hood and use caulking compound to seal exterior wall opening around exhaust hood.

2. Connect vent to exhaust hood

Vent must fit over the exhaust hood. Secure vent to exhaust hood with 4" (102 mm) clamp. Run vent to dryer location using straightest path possible. Avoid 90° turns. Use clamps to seal all joints. Do not use duct tape, screws, or other fastening devices that extend into interior of vent to secure vent, because they can catch lint.

Install Leveling Legs

WARNING

Excessive Weight Hazard

Use two or more people to move and install dryer. Failure to do so can result in back or other injury.

3. Prepare dryer for leveling legs

To avoid damaging floor, use a large flat piece of cardboard from dryer carton; place under entire back edge of dryer. Firmly grasp dryer body (not console panel) and gently lay dryer down on cardboard.

12

Image 12
Contents Table of Contents Dryer Safety Your safety and the safety of others are very importantWhat to do if YOU Smell GAS Installation Requirements Tools and Parts Tools needed for gas installationsTools needed for all installations Parts supplied steam modelsDryer Dimensions Location RequirementsYou will need Front viewCloset installation dryer only Cabinet installation dryer onlyBack view Electric Dryer Power HOOKUP- Canada only Electrical RequirementsGAS Dryer Power Hookup GAS Supply RequirementsGAS Type Natural GasGAS Supply Line GAS Supply Connection RequirementsBurner Input Requirements Dryer GAS PipeInstallation Instructions Venting REQUiREMENTSAlternate exhaust installations for close clearance Choose your exhaust installation typeOptional exhaust installations Plan Vent SystemINStall Vent System Install Leveling LegsMake GAS Connection Connect Inlet HoseAttach long hose to Y connector and tighten couplings Tighten couplingsAttach long hose to dryer fill valve and tighten coupling Turn on cold water faucetConnect vent Level dryerComplete Installation ChecklistTroubleshooting Door ReversalSécurité de la sécheuse Votre sécurité et celle des autres est très importanteQUE Faire Dans LE CAS D’UNE Odeur DE GAZ Exigences Dinstallation Outillage ET Pièces Outils nécessaires aux installations au gazOutils nécessaires pour toutes les installations Pièces fournies tous les modèlesExigences Demplacement Dimensions DE LA SécheuseIl vous faudra Vue de faceVue arrière Installation dans un placard sécheuse seulement Installation sous comptoir personnalisée sécheuse seulement Spécifications ÉlectriquesCest à lutilisateur quincombe la responsabilité de Toutes les sécheusesRaccordement Dune Sécheuse À GAZ Instructions DE Liaison À LA TerreConservez CES Instructions Type DE GAZConversion pour lalimentation au propane Canalisation DE GAZExigences Concernant LE Raccordement AU GAZ Caractéristiques Dalimentation DU BrûleurInstructions Pour LInstallation Exigences ConcernantLévacuation Installations dévacuation facultatives Planification DU Système DévacuationDispositions spéciales pour les maisons mobiles Installation DU Circuit Dévacuation Installer le clapet dévacuationTableau des systèmes dévacuation Raccorder le conduit dévacuation au clapetInstallation DES Pieds DE Nivellement Raccordement AU GAZRaccordement DU Tuyau Darrivée Deau Fixer le tuyau court et le raccord en YSerrer les raccords Fixer le long tuyau au raccord en Y et serrer les raccords16. Déplacer la sécheuse à son emplacement final Raccordement DU Conduit DévacuationRaccorder le conduit dévacuation à la bouche dévacuation Ouvrir le robinet deau froideAchever Linstallation Liste DE Vérification Réglage DE Laplomb DE LA Sécheuse17. Régler laplomb de la sécheuse Serrer et ajuster les pieds de nivellementInversion DE LA Porte DépannageW10240584B W10240585B-SP