Maytag W10240584B GAS Supply Line, GAS Supply Connection Requirements, Burner Input Requirements

Page 9

■■ Your dryer must have the correct burner for the type of gas in your home. Burner information is located on the rating plate in the door well of your dryer. If this information does not agree with the type of gas available, contact your dealer or call the phone numbers referenced in the “Assistance or Service” section of your Use and Care Guide.

LP Gas Conversion:

IMPORTANT: Conversion must be made by a qualified technician.

No attempt shall be made to convert the dryer from the gas specified on the model/serial rating plate for use with a different gas without consulting your gas company.

GAS SUPPLY LINE

■■ Must include 1/8" NPT minimum plugged tapping accessible for test gauge connection, immediately upstream of the gas connection to the dryer.

GAS SUPPLY CONNECTION REQUIREMENTS

■■ Use an elbow and a 3/8" flare x 3/8" NPT adapter fitting between the flexible gas connector and the dryer gas pipe, as needed to avoid kinking.

■■ Use only pipe-joint compound. Do not use TEFLON®† tape.

■■ This dryer must be connected to the gas supply line with a listed flexible gas connector that complies with the standard for connectors for gas appliances, ANSI Z21.24 or CSA 6.10.

BURNER INPUT REQUIREMENTS

Elevations above 10,000 ft. (3,048 m):

■■ When installed above 10,000 ft. (3,048 m) a 4% reduction of the burner Btu rating shown on the model/serial number plate is required for each 1,000 ft. (305 m) increase in elevation.

Gas supply pressure testing

A

C E

■■ The dryer must be disconnected from the gas supply piping system during pressure testing at pressures greater than 1/2 psi.

D

B

A. 3/8" flexible gas connector

B. 3/8" pipe to flare adapter fitting

C. 1/8" NPT minimum plugged tapping

D. 1/2" NPT gas supply line

E. Gas shutoff valve.

■■ 1/2" IPS pipe is recommended.

■■ 3/8"approved aluminum or copper tubing is acceptable for lengths under 20 ft. (6.1 m) if local codes and gas supplier permit.

■■ If you are using Natural gas, do not use copper tubing.

■■ Lengths over 20 ft. (6.1 m) should use larger tubing and a different size adapter fitting.

■■ If your dryer has been converted to use LP gas, 3/8" LP compatible copper tubing can be used. If the total length of the supply line is more than 20 ft. (6.1 m), use larger pipe.

NOTE: Pipe-joint compounds that resist the action of LP gas must be used. Do not use TEFLON®† tape.

■■ Must include shut-off valve

In the U.S.A.:

An individual manual shut-off valve must be installed within six (6) ft. (1.8 m) of the dryer in accordance with the National Fuel Gas Code, ANSI Z223.1. The location should be easy to reach for opening and closing.

In Canada:

An individual manual shut-off valve must be installed in accordance with the B149.1, Natural Gas and Propane Installation Code. It is recommended that an individual manual shutoff valve be installed within six (6) ft. (1.8 m) of the dryer. The location should be easy to reach for opening and closing.

†®TEFLON is a registered trademark of E.I. Dupont De Nemours and Company.

DRYER GAS PIPE

■■ The gas pipe that comes out through the rear of your dryer has a 3/8" male pipe thread.

A

*6¼" (159 mm)

1½" (38 mm)

A. 3/8" NPT dryer pipe

*NOTE: If the dryer is mounted on a pedestal, the gas pipe height must be an additional 10" (254 mm) or 15.5" (394 mm) from the floor, depending on the pedestal model. For a garage installation, the gas pipe height must be an additional 18" (460 mm) from the floor.

9

Image 9
Contents Table of Contents Your safety and the safety of others are very important Dryer SafetyWhat to do if YOU Smell GAS Tools needed for gas installations Installation Requirements Tools and PartsTools needed for all installations Parts supplied steam modelsLocation Requirements Dryer DimensionsYou will need Front viewCloset installation dryer only Cabinet installation dryer onlyBack view Electrical Requirements Electric Dryer Power HOOKUP- Canada onlyGAS Supply Requirements GAS Dryer Power HookupGAS Type Natural GasGAS Supply Connection Requirements GAS Supply LineBurner Input Requirements Dryer GAS PipeVenting REQUiREMENTS Installation InstructionsChoose your exhaust installation type Alternate exhaust installations for close clearanceOptional exhaust installations Plan Vent SystemInstall Leveling Legs INStall Vent SystemConnect Inlet Hose Make GAS ConnectionTighten couplings Attach long hose to Y connector and tighten couplingsAttach long hose to dryer fill valve and tighten coupling Turn on cold water faucetLevel dryer Connect ventChecklist Complete InstallationTroubleshooting Door ReversalVotre sécurité et celle des autres est très importante Sécurité de la sécheuseQUE Faire Dans LE CAS D’UNE Odeur DE GAZ Outils nécessaires aux installations au gaz Exigences Dinstallation Outillage ET PiècesOutils nécessaires pour toutes les installations Pièces fournies tous les modèlesDimensions DE LA Sécheuse Exigences DemplacementIl vous faudra Vue de faceVue arrière Installation dans un placard sécheuse seulement Spécifications Électriques Installation sous comptoir personnalisée sécheuse seulementCest à lutilisateur quincombe la responsabilité de Toutes les sécheusesInstructions DE Liaison À LA Terre Raccordement Dune Sécheuse À GAZConservez CES Instructions Type DE GAZCanalisation DE GAZ Conversion pour lalimentation au propaneExigences Concernant LE Raccordement AU GAZ Caractéristiques Dalimentation DU BrûleurInstructions Pour LInstallation Exigences ConcernantLévacuation Installations dévacuation facultatives Planification DU Système DévacuationDispositions spéciales pour les maisons mobiles Installer le clapet dévacuation Installation DU Circuit DévacuationTableau des systèmes dévacuation Raccorder le conduit dévacuation au clapetRaccordement AU GAZ Installation DES Pieds DE NivellementFixer le tuyau court et le raccord en Y Raccordement DU Tuyau Darrivée DeauSerrer les raccords Fixer le long tuyau au raccord en Y et serrer les raccordsRaccordement DU Conduit Dévacuation 16. Déplacer la sécheuse à son emplacement finalRaccorder le conduit dévacuation à la bouche dévacuation Ouvrir le robinet deau froideRéglage DE Laplomb DE LA Sécheuse Achever Linstallation Liste DE Vérification17. Régler laplomb de la sécheuse Serrer et ajuster les pieds de nivellementInversion DE LA Porte DépannageW10240584B W10240585B-SP