5. Maintenance

»

This chapter is intended for persons with skills in electrical and mechanical areas due to their training, experience and received instructions.

Personnel using the instructions in this chapter must be in- structed of the regulations for the prevention of accidents, the operating conditions and safety regulations and their implemen- tation.

Ensure in each case that the personnel are informed.

For maintenance work taking place at heights of over approx. 1829 mm (6 ft), use only ladders or similar equipment and work- ing platforms intended for this purpose. At greater heights, the proper equipment for protection against falling must be worn.

Use only suitable lifting gear which is in proper working order and load suspension devices with sufficient carrying capacity. Do not stand or work under suspended loads!

Ensure that the electric motors/switch cabinets are sufficiently protected against moisture.

Use only suitable workshop equipment.

Before starting maintenance work, appoint a supervisor.

Inform the responsible personnel before maintenance work on the system is started.

Never operate the equipment when partially dismantled.

All maintenance and repair work not described in this chapter may only be carried out by Sterling service personnel or autho- rized personnel (appointed by Sterling).

SM4-630

Maintenance 35

Image 36
Contents Sspet Sterling Material ProcessingParts and Service Department Technical service Telephone 800 Edition 02/01 Sterling order confirmation noSSPET5 Table of contents Maintenance Technical data Parts list AccessoriesSafety instructions Safety instructionsSSPET5 Explanations and information For your safety SSPET5 SSPET5 For the operating safety of the equipment Assembly instructions Assembly Assembly SM4-630 Mounting the suction pipe MV Electrical connection Installation of the flap switch signal line Installation of the signal line of the SKW optionalSSPET5 Compressed-air supply Functional description General Controller SSE SSPET5 Controller SSP Putting into operation Checking the pipe system Adjusting the suction pipes If the conditions points 3 + 4 are not metIf the conditions points 3 + 4 are met Setting the controller SSE Setting the conveying timeTurbine is running but no material is being conveyed Conveying capacity is too lowSetting the line clear time Change-over keySetting the controller SSP Setting the time intervalAlarm Messages displayed on the controller SSE Initial conveying operationsSSPET5 Alarm Messages displayed on the controller SSP Switching off the unitMaintenance SSPET5 Maintenance intervals Servicing the conveyor Installation RemovalChanging the sealing ring of the outlet flap Adjusting the flap switch Replacing carbon brushes at turbine Installation Technical data Optional FeaturesTechnical data Basic VersionDimension Sheet Parts list SSPET5 Pos Order no Designation Accessories