Sterling SSPET 5 operating instructions General

Page 23

SSPET5

3.1. General

The single conveyor unit functions ac- cording to the principle of suction con- veyance. A high-performance turbine, mounted permanently on the device, provides for the vacuum that is re- quired to convey the material into the separator.

In the separator the material is sepa- rated from air. After the conveying time is finished the turbine is switched off and the material emptied into the mate- rial intermediate hopper. If the filling level remains below the outlet flap of the single conveyor unit, a starting pulse is triggered and sent to the con- troller. Then the conveyance is re- started. This process repeats so often until the material intermediate hopper is filled. Afterwards the conveyance is stopped until a new starting pulse is triggered and sent to the controller.

The automatic filter cleaning takes pla- ce by adjustable compressed-air shocks (pulse duration).

&

The filter-cleaning process takes place during the conveying process.

The filter cartridges are cleaned in adjustable intervals (time interval).

SM4-630

Functional description 22

Image 23
Contents Sterling Material Processing SspetParts and Service Department Telephone 800 Edition 02/01 Sterling order confirmation no Technical serviceSSPET5 Table of contents Technical data Parts list Accessories MaintenanceSafety instructions Safety instructionsSSPET5 Explanations and information For your safety SSPET5 SSPET5 For the operating safety of the equipment Assembly instructions Assembly Assembly SM4-630 Mounting the suction pipe MV Electrical connection Installation of the signal line of the SKW optional Installation of the flap switch signal lineSSPET5 Compressed-air supply Functional description General Controller SSE SSPET5 Controller SSP Putting into operation Checking the pipe system If the conditions points 3 + 4 are met Adjusting the suction pipesIf the conditions points 3 + 4 are not met Conveying capacity is too low Setting the controller SSESetting the conveying time Turbine is running but no material is being conveyedChange-over key Setting the line clear timeSetting the time interval Setting the controller SSPInitial conveying operations Alarm Messages displayed on the controller SSESSPET5 Switching off the unit Alarm Messages displayed on the controller SSPMaintenance SSPET5 Maintenance intervals Servicing the conveyor Removal InstallationChanging the sealing ring of the outlet flap Adjusting the flap switch Replacing carbon brushes at turbine Installation Basic Version Technical dataOptional Features Technical dataDimension Sheet Parts list SSPET5 Pos Order no Designation Accessories