2. Assembly instructions

»These installation instructions are intended for persons with skills in electrical and mechanical areas due to their training, ex-

perience and received instructions.

Personnel using these installation instructions must be instruc- ted in the regulations for the prevention of accidents, the opera- ting conditions and safety regulations and their implementation.

Ensure in each case that the personnel are informed.

The installation instructions provided in the corresponding ope- rating instructions apply for all connected equipment.

Please observe all safety regulations for the operation of lifting gear.

All installation work must be carried out with the equipment dis- connected from electrical power an compressed air supply.

L

For installation work taking place at heights of over approx. 6

 

feet (1829) in, use only ladders or similar equipment and

 

working platforms intended for this purpose. At greater

 

heights, the proper equipment for protection against falling

 

must be worn.

 

Use only suitable lifting gear which is in proper working order

 

and load suspension devices with sufficient carrying capac-

 

ity. Do not stand or work under suspended loads!

 

Use only suitable workshop equipment.

 

 

F

Install the equipment such that all parts are easily accessi-

ble; this facilitates maintenance and repair work.

Assembly instructions 13

Image 14
Contents Sspet Sterling Material ProcessingParts and Service Department Technical service Telephone 800 Edition 02/01 Sterling order confirmation noSSPET5 Table of contents Maintenance Technical data Parts list AccessoriesSafety instructions Safety instructionsSSPET5 Explanations and information For your safety SSPET5 SSPET5 For the operating safety of the equipment Assembly instructions Assembly Assembly SM4-630 Mounting the suction pipe MV Electrical connection Installation of the flap switch signal line Installation of the signal line of the SKW optionalSSPET5 Compressed-air supply Functional description General Controller SSE SSPET5 Controller SSP Putting into operation Checking the pipe system If the conditions points 3 + 4 are met Adjusting the suction pipesIf the conditions points 3 + 4 are not met Turbine is running but no material is being conveyed Setting the controller SSESetting the conveying time Conveying capacity is too lowSetting the line clear time Change-over keySetting the controller SSP Setting the time intervalAlarm Messages displayed on the controller SSE Initial conveying operationsSSPET5 Alarm Messages displayed on the controller SSP Switching off the unitMaintenance SSPET5 Maintenance intervals Servicing the conveyor Installation RemovalChanging the sealing ring of the outlet flap Adjusting the flap switch Replacing carbon brushes at turbine Installation Technical data Technical dataOptional Features Basic VersionDimension Sheet Parts list SSPET5 Pos Order no Designation Accessories