Sterling SSPET 5 operating instructions Controller SSE

Page 24

SSPET5

3.2. Controller SSE

The setting for the conveying time and the line clear time are made via the keys (A1: “change-over” key, A2: “arrow key”) on the front of the control system. The values which have been set will be displayed on the display (B). The values which have been set are maintained after the machine has been shut off.

3 LEDs indicate the respective modes of operation: cleaning (C), conveying (D), line clearing (E).

&

The conveying time can be set from 1 to 99 seconds. The line clear time can be set from 0 to 99 seconds. The clearing time consists of 2 seconds.

The emptying time consists of 8 seconds.

When the unit is switched on all LEDs blink and the software version is displayed.

SM4-630

C

B

D

E

A1A2

Controller SSE

Functional description 23

Image 24
Contents Sspet Sterling Material ProcessingParts and Service Department Technical service Telephone 800 Edition 02/01 Sterling order confirmation noSSPET5 Table of contents Maintenance Technical data Parts list AccessoriesSafety instructions Safety instructionsSSPET5 Explanations and information For your safety SSPET5 SSPET5 For the operating safety of the equipment Assembly instructions Assembly Assembly SM4-630 Mounting the suction pipe MV Electrical connection Installation of the flap switch signal line Installation of the signal line of the SKW optionalSSPET5 Compressed-air supply Functional description General Controller SSE SSPET5 Controller SSP Putting into operation Checking the pipe system Adjusting the suction pipes If the conditions points 3 + 4 are not metIf the conditions points 3 + 4 are met Setting the controller SSE Setting the conveying timeTurbine is running but no material is being conveyed Conveying capacity is too lowSetting the line clear time Change-over keySetting the controller SSP Setting the time intervalAlarm Messages displayed on the controller SSE Initial conveying operationsSSPET5 Alarm Messages displayed on the controller SSP Switching off the unitMaintenance SSPET5 Maintenance intervals Servicing the conveyor Installation RemovalChanging the sealing ring of the outlet flap Adjusting the flap switch Replacing carbon brushes at turbine Installation Technical data Optional FeaturesTechnical data Basic VersionDimension Sheet Parts list SSPET5 Pos Order no Designation Accessories