Step 4 Repeatsteps 1to 3for the other three adapters.
Installing the Chassis
Thissection describes how to install the chassis. This two part process consists of installing the rails into the
rackand then installing the chassis into the rack and on to the rails.
Neverattempt to lift the chassis by using an installed modules handle as a grip point. only use the handles
onthe sides of the chassis.
Caution
Ifthe rackhas wheels,ensure that the brakes are engaged, the stabilizing pads are extended, or that the
rackis otherwisestabilized.
Caution
Table 5: Contents of the Cisco UCS 5108 Server Chassis Rack-Mount Kit (N20-CRMK2=)
Part DescriptionQuantity
Lefttool-less rack mount rail1
Righttool-less rack mount rail1
10-32X 0.75 Phillips round washer head screws6
10-32X 0.125 cage nuts6
Table 6: Contents of the Cisco UCS 5108 Server Round Hole Adapter Kit (N20-CRMK2-RHA=)
Part DescriptionQuantity
Roundhole adapters(threaded)4
Roundhole adapters(un-threaded)4
Adaptersecuring screws4
Phillipshead screws for securing the rails to the rack16
Theplug-socket combination must be accessible at all times, because it serves as the main disconnecting
device.Statement 1019
Warning
Cisco UCS 5108 Server Chassis Installation Guide
OL-20035-05 35
Installation
Installing the Chassis