Site Planning and Maintenance Records

Site Preparation Checklist

Task No. Planning Activity

Verified By

Time

Date

2Environmental evaluation:

Ambient temperature

Humidity

Altitude

Atmospheric contamination

Air flow

3Power evaluation:

Input power type

Power receptacles6

Receptacle proximity to the equipment

Dedicated circuit for power supply

Dedicated (separate) circuits for redundant power supplies

UPS7 for power failures

4Grounding evaluation:

Circuit breaker size

CO ground (AC- powered systems)

5Cable and interface equipment evaluation:

Cable type

Connector type

Cable distance limitations

Interface equipment (transceivers)

6EMI8 evaluation:

Distance limitations for signaling

Site wiring

RFI9 levels

6Verify that the power supply installed in the chassis has a dedicated AC source circuit.

7 UPS: uninterruptable power supply.

Cisco UCS 5108 Server Chassis Installation Guide

80

OL-20035-05

Page 92