Overview

Cisco UCS B420 M3 High Performance Blade Server

Buttons

The Reset button is just inside the chassis and must be pressed using the tip of a paper clip or a similar item. Hold the button down for five seconds and then release it to restart the server if other methods of restarting are not working.

The beaconing function for an individual server may get turned on or off by pressing the combination button and LED. See Interpreting LEDs, on page 25 for details.

The power button and LED allows you to manually take a server temporarily out of service but leave it in a state where it can be restarted quickly.

Connectors

A console port gives a direct connection to a blade server to allow operating system installation and other management tasks to be done directly rather than remotely. The port uses the KVM dongle device included in the chassis accessory kit. See KVM Cable, on page 69 for more information.

Cisco UCS B420 M3 High Performance Blade Server

For full service and installation instructions, see the Cisco UCS B420 M3 High Performance Blade Server Installation and Service Note. You can install up to four UCS B420 M3 High Performance Blade Servers to a chassis.

Figure 7: Cisco UCS B420 M3

1

Hard drive bay 1

8

Power button and LED

2

Hard drive bay 2

9

Network link status LED

3

Hard drive bay 3

10

Blade health LED

4

Hard drive bay 4

11

Console connector

5

Left ejector handle

12

Reset button access

6

Asset tag 3

13

Beaconing LED and button

7Right ejector handle

Cisco UCS 5108 Server Chassis Installation Guide

OL-20035-05

13

Page 25
Image 25
Cisco Systems UCSEZINFRACHSS manual Cisco UCS B420 M3 High Performance Blade Server