
L
SSPET5
Disconnect the equipment from mains supply before starting maintenance procedures to ensure that it cannot be switched on unintentionally.
Depressurize all system sections of the equipment before carrying out any repair work.
F
Please observe the maintenance intervals.
Before starting maintenance work, clean the equipment of oil, fuel or lubricants.
Ensure that materials and incidentals required for operation as well as spare parts are disposed of properly and in an en- vironmentally sound manner.
Use only original Sterling spare parts.
Keep record of all maintenance and repair procedures.