1.2. Explanations and information

Various terms and designations are used in these operating instructions to en- sure clarity. Therefore please note that the terms used in the text stand for the corresponding explanations listed below.

Equipment

“Equipment” can mean an individual unit, a machine or an installation.

Operating personnel

The “operating personnel” are persons operating the equipment on their own re- sponsibility or according to instructions.

Operator

The “operator” of the equipment (production manager, foreman, etc.) is the per- son responsible for all production sequences. The operator instructs the operat- ing personnel of what is to be done.

Operating instructions

The “operating instructions” describe the interaction of the equipment, production sequences or methods. The operating instructions must be compiled by the oper- ator of the equipment.

Equipment foreman

When several operating personnel work on one machine, the “equipment fore- man” coordinates the sequences. The equipment foreman must be appointed by the operator.

Trained personnel

“Trained personnel” are persons who, due to their training, are authorized to carry out the required work.

SM4-630

Safety instructions 8

Image 9
Contents Sterling Material Processing SspetParts and Service Department Telephone 800 Edition 02/01 Sterling order confirmation no Technical serviceSSPET5 Table of contents Technical data Parts list Accessories MaintenanceSafety instructions Safety instructionsSSPET5 Explanations and information For your safety SSPET5 SSPET5 For the operating safety of the equipment Assembly instructions Assembly Assembly SM4-630 Mounting the suction pipe MV Electrical connection Installation of the signal line of the SKW optional Installation of the flap switch signal lineSSPET5 Compressed-air supply Functional description General Controller SSE SSPET5 Controller SSP Putting into operation Checking the pipe system Adjusting the suction pipes If the conditions points 3 + 4 are not metIf the conditions points 3 + 4 are met Setting the conveying time Setting the controller SSETurbine is running but no material is being conveyed Conveying capacity is too lowChange-over key Setting the line clear timeSetting the time interval Setting the controller SSPInitial conveying operations Alarm Messages displayed on the controller SSESSPET5 Switching off the unit Alarm Messages displayed on the controller SSPMaintenance SSPET5 Maintenance intervals Servicing the conveyor Removal InstallationChanging the sealing ring of the outlet flap Adjusting the flap switch Replacing carbon brushes at turbine Installation Optional Features Technical dataTechnical data Basic VersionDimension Sheet Parts list SSPET5 Pos Order no Designation Accessories