Furuno DS-60 installation manual Transceiver Unit DS-620, Installation considerations

Page 10

1. INSTALLATION

1.2Transceiver Unit DS-620

Installation considerations

Since the transceiver unit generates heat, install it in a dry, well-ventilated place. The cooling fans at the top of the unit must not be obstructed, to allow heat to escape.

This unit is designed for bulkhead mounting to permit dissipation of heat. If bulkhead mounting is absolutely impossible, mount the unit on the floor leaving at least 350 mm clearance between it and the floor to permit dissipation of heat.

Reinforce the mounting area, if necessary.

Leave space around the unit for maintenance and checking. Refer to the drawing at the back of this manual for minimum recommended maintenance space.

A magnetic compass will be affected if the transceiver unit is placed too close to it. Observe the compass safe distances to prevent disturbance to the magnetic compass (page i).

Use four hex. bolts (M10x20) to fix the transceiver unit to the mounting area. See the outline draw- ing at the back of this manual.

1.Screw in lower hex. bolts so there is 5 mm clearance between bottom of screw head and bulk- head.

2.Hang the unit on the bolts, then tighten the bolts.

3.Fasten the unit with upper hex. bolts.

Fixing hole 2- 12

210±1 (8.27”)

590±1 (23.23”)

15 (0.59”)

12 (0.47”) 210±1 (8.27”)

620 (24.41”)

35 (1.38”)

(7)

1-4

Image 10
Contents Installation Manual Iii00017233810 Safety Instructions System Configurations Equipment Lists Standard supplyOptional Supply Mounting consideration Display Unit DS-600Flush mount Hanger assembly Type OP26-8, Code No Desktop or table underside mountHow to set the cosmetic cap and alarm lid assy Installation considerations Transceiver Unit DS-620Distributor Unit DS-610 Installation location TransducerInstallation using the transducer tank DS-660 Transducer tank DS-660, sectional viewHex. bolt 15 Seal washer Fixing plate Hex. bolt M6x20 Spring washer M6 Cable assy Metal fixing Transducer tank, sectional view Installation with gate valve DS-661 DS-661 gate valve, sectional viewInstallation Installation Installation How to open the gate valve Junction Box DS-640 option Mounting procedure Mounting considerationsApply silicon rubber to M10 bolts as shown below Pass the cable through the cable gland as shown below Remote Controller RD-501/Dimmer Controller RD-502 option How to change orientation of the front cover of DS-605Leveling adjustment Rate-of-Turn Gyro DS-340 optionThis page is intentionally left blank Wiring Precautions for cable installationConnection of Wago connector Top cover Cable clamps, entrancesTB3 TB1 TB5 TB2 TB4 TB8 DS-610 Distributor Unit DS-620 Transceiver unit DS-600 Display unit DS-600, example of connection Junction Box DS-640, option DS-640 Junction BoxMenu Settings How to Use the Service MenuMenu item Meaning Option How to show the System menu How to Set the System MenuHow to set ship’s data How to enter offset values Meaning Setting rangeHow to correct the ship’s speed This page is intentionally left blank Milepost run AP-1Calculation with transit posts AP-2 Calculation with DS-60AP-3 Appendix 2 JIS Cable Guide AP-4+/05+105+0&4#9+014440%10. #% #6 #6 52#42#465.+5614 5 #%%5514+5 Page Page Page Dec/08 R.Esumi Mar/09 R.Esumi Dec/08 R.Esumi 14/Jul/09 R.Esumi 14/Jul/09 R.Esumi 26/Oct/09 R.Esumi Dec/08 R.Esumi Dec/08 R.Esumi Dec/08 R.Esumi Doppler Sonar