Furuno DS-60 installation manual Pass the cable through the cable gland as shown below

Page 25

1. INSTALLATION

3) Pass the cable through the cable gland as shown below.

Gasket*

Washer*

{

Clamping gasket

TTYCYS-4 cable

*: Attached inside the cable gland

4)Put the flush mounting sponge to the flange from the rear side of the DS-600.

5)Open the front cover of the DS-605 and connect the ground wire attached inside the DS- 605 to the ground terminal on the rear of the DS-600.

6)Connect the cables to the DS-600. Refer to chapter 2.

3.Remove each binding head screw from four corners of the DS-605 and set the D-600 to the DS-605.

4.Apply silicon grease to the binding head screws and fix the DS-600 to the DS-605 with four binding head screws.

5.Tighten the clamping glands to fix the cables.

6.Apply the putty to the cable glands for waterproofing.

7.Connect the ground terminal for the DS-605 to the ground terminal on the hull with the IV-1.25 sq. wire.

1-19

Image 25
Contents Iii Installation Manual00017233810 Safety Instructions System Configurations Standard supply Equipment ListsOptional Supply Mounting consideration Display Unit DS-600Flush mount Desktop or table underside mount Hanger assembly Type OP26-8, Code NoHow to set the cosmetic cap and alarm lid assy Transceiver Unit DS-620 Installation considerationsDistributor Unit DS-610 Transducer Installation locationTransducer tank DS-660, sectional view Installation using the transducer tank DS-660Hex. bolt 15 Seal washer Fixing plate Hex. bolt M6x20 Spring washer M6 Cable assy Metal fixing Transducer tank, sectional view DS-661 gate valve, sectional view Installation with gate valve DS-661Installation Installation Installation How to open the gate valve Junction Box DS-640 option Mounting considerations Mounting procedureApply silicon rubber to M10 bolts as shown below Pass the cable through the cable gland as shown below How to change orientation of the front cover of DS-605 Remote Controller RD-501/Dimmer Controller RD-502 optionRate-of-Turn Gyro DS-340 option Leveling adjustmentThis page is intentionally left blank Precautions for cable installation WiringTop cover Cable clamps, entrances Connection of Wago connectorTB3 TB1 TB5 TB2 TB4 TB8 DS-610 Distributor Unit DS-620 Transceiver unit DS-600 Display unit DS-600, example of connection DS-640 Junction Box Junction Box DS-640, optionHow to Use the Service Menu Menu SettingsMenu item Meaning Option How to show the System menu How to Set the System MenuHow to set ship’s data Meaning Setting range How to enter offset valuesHow to correct the ship’s speed This page is intentionally left blank Milepost run AP-1Calculation with transit posts Calculation with DS-60 AP-2AP-3 AP-4 Appendix 2 JIS Cable Guide+/05+105+0&4#9+014440%10. #% #6 #6 52#42#465.+5614 5 #%%5514+5 Page Page Page Dec/08 R.Esumi Mar/09 R.Esumi Dec/08 R.Esumi 14/Jul/09 R.Esumi 14/Jul/09 R.Esumi 26/Oct/09 R.Esumi Dec/08 R.Esumi Dec/08 R.Esumi Dec/08 R.Esumi Doppler Sonar