Sterling AF-XXX specifications Preventative Maintenance Schedule

Page 39

Chapter 6: Maintenance

6-1 Preventative Maintenance Schedule

The checklist below contains a list of items which should be inspected and/or replaced to keep your Additive Feeder operating at peak efficiency. Perform each inspection at the regular intervals listed below.

System model #

 

 

 

 

 

 

 

 

 

 

Serial #

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Every week

Date/

Date/

 

Date/

Date/

 

Date/

 

Date/

Date/

Date/

Date/

 

Date/

Date/

Date/

Date/

By

By

 

By

 

By

 

 

By

 

By

By

 

By

 

By

 

By

By

By

By

Inspect auger,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

sleeve and hopper

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

throat. Clean if

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

dirty.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Every month

Jan

Feb

 

Mar

 

Apr

 

May

 

Jun

 

Jul

 

Aug

 

Sep

 

Oct

 

Nov

 

Dec

Lock out electrical

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

power and inspect

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

electrical wiring for

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

integrity.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Visually inspect the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

operation of motor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

and auger while it

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

is operating.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

- Photocopy this page for your maintenance records -

Additive Feeders

Chapter 6: Maintenance

39 of 55

Image 39
Contents SF Series Additive Feeders Shipping Information Table of Contents Program Parameter Descriptions Safety How to Use This ManualSafety Symbols Used in this Manual Wear Safety Glasses and Work Gloves General Responsibility ResponsibilityRemember Operator ResponsibilityMaintenance Responsibility Additive Feeder Safety TagsReporting a Safety Defect Models Covered in This Manual Standard FeaturesMechanical Features Functional DescriptionElectrical Features Controller FeaturesOptions Safety Devices and Interlocks AccessoriesSafety Circuit Standards Safety Device Lock-OutsFail Safe Operation Rigging and Placing the Additive Feeder InstallationSupply System Installation Uncrating the EquipmentMain Power Connection Electrical ConnectionsControl Relay Connection Determining the Desired Feed Rate Setup Procedures110 100 Calibration Procedure ProcedureEquipment Needed Observed Feed Rates ExamplesShutting Down the Additive Feeder Initial Start-upPre-Startup Checks Starting Up the Additive FeederStart-up Timer ModuleUsed as a Cycle Override Safety Timer OperationElapsed Time Module Counter ModuleField Control Programming Injection Molding ApplicationsInjection Molding Control Relay ConnectionResetting the Unit to Un-Programmed State JP1 Program Enable JumperProgramming Step by Step Guide Additive Feeders Operation Injection Mode Application Notes Extruder Tracking Control Extrusion ApplicationsExtruder Tracking Equation Extruder Tracking Installation and SetupRunning Mode Parameter-Selection ModeValue Mode Resetting the Unit to Un-Programmed State Input Pulse Signal Requirements Extruder Tracking Control Application NotesMinimum Input Pulse Rate Minimum and Maximum Percent Setpoints Maximum Input Pulse RateDefining Program Parameters Program Parameter DescriptionsMode 1 Default to Zero Parameter 19 Power-up Value Parameter 35 Signal Input 2 S2 Input Configuration Parameter 36 Signal Input 2 S2 Setpoint Maintenance Preventative Maintenance SchedulePhotocopy this page for your maintenance records Material Cleanout/Changeover Preventative MaintenanceInstalling Auger Assembly Corrective MaintenanceAuger Assembly Changeover Removing Auger AssemblyMotor Brush Replacement Troubleshooting Problem Possible cause Corrective actionIntroduction Problem Possible cause Corrective action Additive Feeders Troubleshooting Technical Specifications AppendixAnnex B Information Additive Feeder Specifications and Overall Dimensions Drawings and DiagramsTypical Additive Feeder Controllers Exploded Assembly Drawing Parts List Spare Parts ListDetail # Part number Part/assembly description One Component Control Enclosure Parts Identification Credit Returns Safety Tag InformationWarranty Returns Returned Material PolicyCompany Logo Additive Feeder Identification Serial Number TagSterling, Inc Th Street New Berlin, WI Technical AssistanceWorksheet for Charting Feed Rates