FWD WHEELCHAIRS | PROCEDURE 17 |
|
|
DETAIL “A” - REMOVING - STEP 2;
INSTALLING - STEP 5
Handle
Outside
LowerEdgeCounterweight
DETAIL “B” - REMOVING - STEP 3;
INSTALLING - STEPS 3, 4
Mounting Bracket
Counterweight
Bottom Shoulder Screw | Bottom | |
Slot | ||
|
DETAIL “C” - REMOVING - STEP 4;
INSTALLING - STEP 2
Counterweight | Top Slot in |
| |
Top Shoulder | Mounting |
Screw | Bracket |
Bottom Shoulder Screw
Bottom Slot in Mounting Bracket
REPLACING GROUP 24 BATTERY BOX SUB-FRAME (FIGURE 5)
Removing
1.Removetherearshroud.RefertoREMOVING/INSTALL- ING REAR SHROUD in this procedure of the manual.
2.Removethecounterweight.RefertoREMOVING/INSTALL- INGCOUNTERWEIGHTinthisprocedureofthemanual.
3.Removethebatteryboxes.RefertoINSTALLING/RE- MOVING GROUP 24 BATTERY BOXES in PRO- CEDURE 9 of this manual.
4.Cut tie wrap A, which secures the sensor cable AND the LEFT motor cable to the battery box
5.Cut
6.Remove the two (2) mounting screws and locknuts that secure the wiring harness w/bracket to the bat- tery box
7.Remove the wiring harness w/bracket from the bat- tery box
8.Remove the four (4) mounting screws and washers that secure the battery box
9.Remove the EXISTING
10.Remove the four (4) mounting screws and wash- ers that secure the two (2) mounting brackets to the
11.Install the four (4) mounting screws and washers that secure the two (2) NEW mounting brackets to the
12.Install the four (4) mounting screws that secure the NEW battery box
13.Install the two (2) mounting screws and locknuts that secure the wiring harness w/bracket to the NEW bat-
14.Secure the sensor cable AND the LEFT motor cable to the NEW battery box
15.Secure the battery charger cable AND the RIGHT motor cable to the NEW battery box
F
W D
W H E E L C H A I R S
FIGURE 4 - REMOVING/INSTALLING | 16. Reinstallthebatteryboxes.RefertoINSTALLING/RE- | |
COUNTERWEIGHT | ||
MOVING GROUP 24 BATTERY BOXES in PRO- | ||
| ||
| CEDURE 9 of this manual. |
93