Lincoln Electric SVM168-B service manual Test Procedure

Page 56

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

F-16

TROUBLESHOOTING & REPAIR

F-16

 

 

 

ROTOR VOLTAGE TEST (continued)

FIGURE F.1 - LOCATION OF LEAD 200A AND 219 FOR ROTOR VOLTAGE TEST

Brushes

Slip Rings

 

 

 

 

 

Lead 200A

-

Lead 219

+

 

 

 

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

TEST PROCEDURE

1.With the 5/16” nut driver, remove the 6 sheet metal screws from the case top.

2.Remove the rubber gasket (cover seal) from the lift bail.

3.Remove the fuel cap. The rubber gasket for the fill tube will come off with the case top.

4.Remove the case top, then reinstall the fuel cap.

5.With the 5/16” nut driver, remove the 5 screws holding the right case side.

6.Remove the right case side by lifting up and out.

7.Set the volt/ohmmeter to the DC volts position.

8.Connect the positive meter probe to the brush nearest the rotor lamination (lead 200A). See Figure F.1 for location.

9.Connect the negative meter probe to the other brush (lead 219).

10.Start the engine and run it at high idle (3650 RPM). Set the output control to the MAXIMUM position (position 10).]

11.Check the voltage reading on the volt- meter. It should read between 37 and 46 VDC.

12.If the voltage reading is low or not pre- sent, the generator field is not functioning properly. Perform the Rotor Resistance Test. The Field Diode Bridge (D2), the Field Capacitor (C1), and/or the Printed Circuit Board may be faulty.

13.If the voltage reading is normal, the field circuit is functioning properly. Install the right case side with the 5 sheet metal screws with the 5/16” nut driver. Remove the fuel cap; install the case top and tight- en the 6 sheet metal screws with the 5/16” nut driver. Install the rubber gasket over the lift bail and install the fuel cap.

RANGER® 10,000 & RANGER® 10,000 PLUS

Image 56
Contents Ranger 10,000 /10,000 Plus For Engine SafetyPowered equipment ARC Rays can burn Fumes and GasesIii Welding and Cutting Sparks can cause fire or ExplosionCylinder may explode If damaged Précautions DE Sûreté Master Table of Contents for ALL Sections Section A-1 Table of ContentsInstallation Section Installation Height Width Depth WeightHorsepower Operating Speed RPM Safety Precautions Spark ArresterMachine Grounding TowingPRE-OPERATION Service GasolineVehicle Mounting Can cause fire or explosionWelding Output Cables Total Combined Length of Electrode and Work CablesAngle of Operation LiftingConnection of Lincoln Electric Wire Feeders InstructionsStacking Welder OperationAuxiliary Power 120/240 Volt Dual Voltage ReceptacleDuplex Receptacles Motor StartingThese Devices Without Additional Resistive Type Loads Not USE These Devices With a Ranger 10,000Simultaneous Welding and Power Standby Power ConnectionsFigure A.1 Ranger 10,000 & Ranger 10,000 Plus Operation Operation SectionSection B-1 Welder Controls Function and Operation Engine SwitchOperation Polarity Switch Range SwitchKohler Honda Robin / Subaru 20 H.P. Command Control DialSTARTING/SHUTDOWN Instructions BREAK-IN PeriodStarting the Engine Stopping the EngineTIG Constant Current Welding Wire Feed Welding Processes Constant VoltageStick Constant Current Welding Start Switch Wire FEED, LN-15 Summary of Welding ProcessesAccessories Section Section C-1Accessories Optional Equipment Field InstalledRecommended Equipment StickTIG Welding Plasma CuttingRanger 10,000 & Ranger 10,000 Plus Maintenance Section Section D-1Kohler Honda MaintenanceSafety Precautions AIR Cleaner and Other Maintenance OIL Filter ChangeEngine Adjustments BatteryOverspeed is Hazardous Slip RingsPre-Cleaner Oil FilterAir Filter ElementFigure D.1 Major Component Location Theory of Operation Theory of Operation SectionSection E-1 BATTERY, STARTER, ENGINE, ROTOR, STATOR, and Idler Solenoid Theory of OperationRotor Field Feedback and Auxiliary Power Figure E.3 Rotor Field Feedback and Auxiliary PowerWeld WINDING, REACTOR, Range Switch Figure E.4 Weld WINDING, REACTOR, and Range SwitchOutput BRIDGE, Choke Polarity SWITCH, and Output Terminals Ranger 10,000 & Ranger 10,000 Plus Troubleshooting & Repair Section Section F-1Troubleshooting & Repair HOW to USE Troubleshooting GuidePC Board Troubleshooting Procedures Electric ShockTroubleshooting Guide Output ProblemsOutput Problems Field Winding Voltage Test Adjustment Test Troubleshooting Guide Output Problems Engine Problems Make sure the leads are looped Charging Circuit Test Welding Problems Ranger 10,000 & Ranger 10,000 Plus Materials Needed Rotor Voltage TestTest Description Test Procedure Rotor Resistance Test Rotor Resistance Test Figure F.2 Location of Rotor Slip RingsTroubleshooting & Repair Ranger 10,000 & Ranger 10,000 Plus Auxiliary and Field Winding Test To test the 230 VAC winding Auxiliary and Field Winding TestTo test the 115 VAC winding To test the field winding Ranger 10,000 & Ranger 10,000 Plus Output Rectifier Bridge Test Figutpure F.4 Locationctifof Output Rectifier Leads 26TROUBLESHOOTING & REPAIRF-26Output Rectifier Bridge Test Charging Circuit Test Charging Circuit Test Figure F.5 Location of Voltage RegulatorEngine Throttle Adjustment Test Engine Throttle Adjustment Test Figure F.6 Blower Paddle Marked for STROBE-TACH MethodFigure F.7 Oscilloscope Method High Idle no Load Output Control AT Maximum Scope SettingsNormal Open Circuit Voltage Waveform 115 VAC Supply Machine Loaded to 200 Amps AT 20 VDC Typical DC Weld Output Waveform CV ModeMachine Loaded Typical DC Weld Output Waveform CC Mode Machine Loaded to 200 Amps AT 26 VDCTypical AC Weld Output Waveform Machine Loaded to 225 Amps AT 25 VDCAbnormal Open Circuit Weld Voltage Waveform CV Mode Abnormal Open Circuit DC Weld Voltage Waveform Normal Open Circuit Weld Voltage Waveform CV Mode Normal Open Circuit DC Weld Voltage Waveform CC Mode Normal Open Circuit AC Weld Voltage Waveform Ranger 10,000 & Ranger 10,000 Plus Brush Removal and Replacement DescriptionBrush Removal and Replacement ProcedureSlip Rings Figure F.9 Brush LEADS/BRUSHES Retained with Cable TIERanger 10,000 & Ranger 10,000 Plus Printed Circuit Board Removal Replacement Printed Circuit Board Removal and Replacement Figure F.10 Printed Circuit Board LocationReplacement Printed Circuit Board RemovalRanger 10,000 & Ranger 10,000 Plus Output Rectifier Bridge Removal Replacement Remove the case top, then reinstall the fuel cap Output Rectifier Bridge RemovalSection TOC Ranger 10,000 & Ranger 10,000 Plus ENGINE/ROTOR Removal and Replacement InstructionsENGINE/ROTOR Removal Figure F.12 Component LOCATIONS, ENGINE/ROTOR RemovalEngine and Rotor Removal Procedure Rotor Removal Procedure Figure F.13 Engine and Rotor Removed from Stator THRU-BOLTReplacement KIT S20788 Reassembly ProcedureRetest After Repair Section G-1 Electrical Diagrams SectionElectrical Diagrams Electrical Diagrams Wiring Diagram Code 11041 only -M20226Wiring Diagram Code 11095 only M20301 Ranger 10,000 HondaRanger 10,000 Wiring Diagram Code 11398 M21269 Ranger 10,000 Plus Schematic Entire Machine Codes 11395 and 11398 L13105 L13105Schematic Entire Machine CDE 11394 L13103 L13103Schematic Entire Machine Code 11095 & 11253 only L12257 Schematic Entire Machine Code 11151 only L12249-1 L12249Electrical Diagrams Electrical Diagrams