STARTING/SHUTDOWN INSTRUCTIONS

STARTING THE ENGINE

WARNING

Do not touch electrically live parts of electrode with skin or wet clothing.

Keep flammable material away.

Insulate yourself from work and

ground. Wear eye, ear, and body protection.

• Keep your head out of the fumes.

• Use ventilation or exhaust to

remove fumes from breathing

zone.

 

 

Be sure all Pre-Operation Maintenance has been per-

formed. Also, read the Engine Ownerʼs Manual before

starting for the first time.

 

 

Remove all loads connected to the AC power recepta-

cles. Use the choke control as follows:

 

 

KOHLER ENGINE - Always pull the choke control out

when starting the engine; cold, warm or hot.

 

HONDA ENGINE - If the engine is cold, pull the choke

control out. Do Not use the choke if the engine is warm

or hot.

position and

Turn the engine switch to the “start”

crank the engine until it starts. Release the switch as

soon as the engine starts, slowly return the choke

control to the full “in” position (choke open),

and turn

the switch to the Auto Idle position.

/

Do not turn the switch to the “start” position while the engine is running because this will cause damage to the ring gear and/or starter motor.

After running at high engine speed for 10-14 seconds, the engine will go to low idle.

Allow the engine to warm up by letting it run at low idle for a few minutes.

STOPPING THE ENGINE

Remove all welding and auxiliary power loads and allow engine to run at low idle speed for a few minutes to cool the engine.

Stop the engine by placing the Engine switch in the

“OFF” position.

A fuel shut off valve is not required on the RANGER® 10,000 because the fuel tank is mounted below the engine.

BREAK-IN PERIOD

It is normal for any engine to use a greater amount of oil until the break-in is accomplished. Check the oil level twice a day during the break-in period (approxi- mately 50 running hours).

IMPORTANT: IN ORDER TO ACCOMPLISH THIS BREAK-IN, THE UNIT SHOULD BE SUBJECTED TO MODERATE LOADS, WITHIN THE RATING OF THE MACHINE. AVOID LONG IDLE RUNNING PERIODS. REMOVE LOADS AND ALLOW ENGINE TO

COOL BEFORE SHUTDOWN.

The engine manufacturerʼs recommendation for the running time until the first oil change is as follows:

KOHLER

HONDA

ROBIN/SUBARU

5 HRS.

First Month

25 HRS.

 

or 20 HRS.

 

The oil filter is to be changed at every second oil change. Refer to the Engine Ownerʼs Manual for more information.

RANGER® 10,000 & RANGER® 10,000 PLUS

Image 22
Contents Ranger 10,000 /10,000 Plus Powered equipment SafetyFor Engine ARC Rays can burn Fumes and GasesCylinder may explode If damaged Welding and Cutting Sparks can cause fire or ExplosionIii Précautions DE Sûreté Master Table of Contents for ALL Sections Installation Section Table of ContentsSection A-1 Installation Height Width Depth WeightHorsepower Operating Speed RPM Machine Grounding Safety PrecautionsSpark Arrester TowingVehicle Mounting PRE-OPERATION ServiceGasoline Can cause fire or explosionAngle of Operation Welding Output CablesTotal Combined Length of Electrode and Work Cables LiftingStacking Connection of Lincoln Electric Wire FeedersInstructions Welder OperationDuplex Receptacles Auxiliary Power120/240 Volt Dual Voltage Receptacle Motor StartingThese Devices Without Additional Resistive Type Loads Not USE These Devices With a Ranger 10,000Simultaneous Welding and Power Standby Power ConnectionsFigure A.1 Ranger 10,000 & Ranger 10,000 Plus Section B-1 Operation Section Operation Operation Engine SwitchWelder Controls Function and Operation Kohler Honda Robin / Subaru 20 H.P. Command Polarity SwitchRange Switch Control DialStarting the Engine STARTING/SHUTDOWN InstructionsBREAK-IN Period Stopping the EngineStick Constant Current Welding Wire Feed Welding Processes Constant VoltageTIG Constant Current Welding Start Switch Wire FEED, LN-15 Summary of Welding ProcessesAccessories Section Section C-1Accessories Optional Equipment Field InstalledTIG Welding Recommended EquipmentStick Plasma CuttingRanger 10,000 & Ranger 10,000 Plus Maintenance Section Section D-1Safety Precautions MaintenanceKohler Honda AIR Cleaner and Other Maintenance OIL Filter ChangeOverspeed is Hazardous Engine AdjustmentsBattery Slip RingsAir Filter Pre-CleanerOil Filter ElementFigure D.1 Major Component Location Section E-1 Theory of Operation SectionTheory of Operation BATTERY, STARTER, ENGINE, ROTOR, STATOR, and Idler Solenoid Theory of OperationRotor Field Feedback and Auxiliary Power Figure E.3 Rotor Field Feedback and Auxiliary PowerWeld WINDING, REACTOR, Range Switch Figure E.4 Weld WINDING, REACTOR, and Range SwitchOutput BRIDGE, Choke Polarity SWITCH, and Output Terminals Ranger 10,000 & Ranger 10,000 Plus Troubleshooting & Repair Section Section F-1Troubleshooting & Repair HOW to USE Troubleshooting GuidePC Board Troubleshooting Procedures Electric ShockTroubleshooting Guide Output ProblemsOutput Problems Field Winding Voltage Test Adjustment Test Troubleshooting Guide Output Problems Engine Problems Make sure the leads are looped Charging Circuit Test Welding Problems Ranger 10,000 & Ranger 10,000 Plus Test Description Rotor Voltage TestMaterials Needed Test Procedure Rotor Resistance Test Rotor Resistance Test Figure F.2 Location of Rotor Slip RingsTroubleshooting & Repair Ranger 10,000 & Ranger 10,000 Plus Auxiliary and Field Winding Test To test the 115 VAC winding Auxiliary and Field Winding TestTo test the 230 VAC winding To test the field winding Ranger 10,000 & Ranger 10,000 Plus Output Rectifier Bridge Test Output Rectifier Bridge Test 26TROUBLESHOOTING & REPAIRF-26Figutpure F.4 Locationctifof Output Rectifier Leads Charging Circuit Test Charging Circuit Test Figure F.5 Location of Voltage RegulatorEngine Throttle Adjustment Test Engine Throttle Adjustment Test Figure F.6 Blower Paddle Marked for STROBE-TACH MethodFigure F.7 Oscilloscope Method Normal Open Circuit Voltage Waveform 115 VAC Supply Scope SettingsHigh Idle no Load Output Control AT Maximum Machine Loaded Typical DC Weld Output Waveform CV ModeMachine Loaded to 200 Amps AT 20 VDC Typical DC Weld Output Waveform CC Mode Machine Loaded to 200 Amps AT 26 VDCTypical AC Weld Output Waveform Machine Loaded to 225 Amps AT 25 VDCAbnormal Open Circuit Weld Voltage Waveform CV Mode Abnormal Open Circuit DC Weld Voltage Waveform Normal Open Circuit Weld Voltage Waveform CV Mode Normal Open Circuit DC Weld Voltage Waveform CC Mode Normal Open Circuit AC Weld Voltage Waveform Ranger 10,000 & Ranger 10,000 Plus Brush Removal and Replacement DescriptionBrush Removal and Replacement ProcedureSlip Rings Figure F.9 Brush LEADS/BRUSHES Retained with Cable TIERanger 10,000 & Ranger 10,000 Plus Printed Circuit Board Removal Replacement Printed Circuit Board Removal and Replacement Figure F.10 Printed Circuit Board LocationReplacement Printed Circuit Board RemovalRanger 10,000 & Ranger 10,000 Plus Output Rectifier Bridge Removal Replacement Remove the case top, then reinstall the fuel cap Output Rectifier Bridge RemovalSection TOC Ranger 10,000 & Ranger 10,000 Plus ENGINE/ROTOR Removal and Replacement InstructionsENGINE/ROTOR Removal Figure F.12 Component LOCATIONS, ENGINE/ROTOR RemovalEngine and Rotor Removal Procedure Rotor Removal Procedure Figure F.13 Engine and Rotor Removed from Stator THRU-BOLTReplacement KIT S20788 Reassembly ProcedureRetest After Repair Electrical Diagrams Electrical Diagrams SectionSection G-1 Electrical Diagrams Wiring Diagram Code 11041 only -M20226Wiring Diagram Code 11095 only M20301 Ranger 10,000 HondaRanger 10,000 Wiring Diagram Code 11398 M21269 Ranger 10,000 Plus Schematic Entire Machine Codes 11395 and 11398 L13105 L13105Schematic Entire Machine CDE 11394 L13103 L13103Schematic Entire Machine Code 11095 & 11253 only L12257 Schematic Entire Machine Code 11151 only L12249-1 L12249Electrical Diagrams Electrical Diagrams