All operator controls are located on the Front Panel/Nameplate of the machine. See Figure B.1 for the location of each control.

ELECTRIC

WIRE-MATIC 250

LINCOLN

 

ON

OFF

Figure B.1 - Operator Controls.

Return to Section TOC

Return to Master TOC

1.POWER SWITCH: Toggle switch to turn input power ON and OFF. Place the lever in the ON position to turn the WIRE-MATIC 250 ON.

2.PILOT LIGHT: The red LED pilot light located next to the POWER SWITCH is lit when the power is ON.

3.VOLTAGE CONTROL POTENTIOMETER KNOB: Provide continuous adjustment of power source output voltage over the rated 12 to 28 volt range. Voltage can be adjusted while welding.

4.WIRE SPEED CONTROL POTENTIOMETER KNOB: Controls the wire speed from 50 to 600

inches per minute (1.2 to 15.2 m/min). The control can be preset on the dial to the setting specified on the Procedure Decal on the inside of the wire com- partment door. Wire speed is not affected when changes are made in the voltage control.

NOTE: When the trigger is pulled, the wire feeder feeds wire at low speed regardless of the wire feed speed set on the control until the welding arc starts or 2 seconds has elapsed. This feature enhances start- ing and makes it easier to set the stickout. The 2 sec- ond limit permits high speed loading of the gun and cable.

WIRE-MATIC 250

Image 23
Contents Safety Depends on You WIRE-MATICARC Welding can be hazardous SafetyCylinder may explode if damaged Iii Electric and MAG- Netic FieldsSûreté Pour Soudage a L’Arc Précautions DE SûretéWIRE-MATIC Table of Contents Table of Contents Installation Type 750C Copper Duty Cycle Amps Volts at Rated AmpsCurrent Range Fuse SuperlagStacking Safety PrecautionsSelect Proper Location Input ConnectionsInput Power Connections and Ground Connections Fuse and Wire SizesConnect Shielding GAS Figure A.4 Input Air Supply Connections Reconnect ProcedureFigure A.5 Reconnect Diagram For 208/230/1/60 Machines Output Polarity Connection InstallationInstall the Work Clamp Connect Output Components GUN Liner and ContactGUN and Cable Installation Wire Size Conversion PartsWIRE-MATIC Operation WELDING, Cutting Safety InstructionsGeneral Description Recommended Processes and Equipment Design Features AdvantagesUnit Features Power Source FeaturesDuty Cycle Amps Volts Wire Feeder FeaturesMachine Capability LimitationsFigure B.1 Operator Controls Controls and SettingsLoading the Wire Reel Using the Wire Drive RollProcedure for Changing Drive Roll To mount 10 to 30 lb. spools 8 and 12 diameter Proper Wire FeedingFeeding Electrode Starting the Welder Setting Idle Roll PressureOperating Steps Making a Weld WIRE-MATIC Accessories K607-1 Spool GUN Adapter KIT OPTIONS/ACCESSORIESInstalling the K607-1 Spool GUN Adapter KIT Spool GUN Module Board InstallationReturn Return to Section TOC Spool GUN Connection BOX InstallationSpool GUN Preparation Spool GUN ConnectionMaking the Weld Making a Weld with the Spool GUN Adapter K607-1 InstalledTimer KIT K585-1 To Make Spot Plug Welds Steel Wire Sizes Part NumberAluminum Wire Sizes Drive Roll KitsMaintenance Perform the following daily Routine and Periodic MaintenanceMaintenance DROP-IN Reel Spindle and Clips Contact TIP and GAS Nozzle InstallationCable Cleaning Drive Rolls and Guide Tubes GUN Tubes and NozzlesFigure D.2 Liner maintenance Liner Removal ReplacementTo open up the handle GUN Handle DisassemblyDescription English Size Metric Size WIRE-MATIC Theory of Operation Transformer Input Line Voltage and MainFeedback Control Output RectificationFigure E.4 Constant Voltage Output Constant Voltage OutputFeedback Wire Drive MotorThermal Protection Figure E.6 SCR Operation SCR OperationWIRE-MATIC Troubleshooting & Repair Recommended Course of Action HOW to USE Troubleshooting GuideBoard can be dam- aged by static electricity PC Board Troubleshooting ProceduresElectric Shock can kill Main Transformer Rectifier Assembly Test To Section TOC Perform the SCR Rectifier Perform the Wire Drive Motor Trolyte in these capacitors is Liquid elecPerform the Output Rectifier Materials Needed Main Transformer TestTest Description ON/OFF Power Switch will be hot during these tests Main Transformer Test Test ProcedureMain Transformer Test Static SCR Rectifier Assembly Test Leads Figure F.4 SCR 1 Test Points Active SCR Rectifier Assembly Test Leads SCR connections Figure F.7 SCR Tester CircuitWire Drive Motor and Tachometer Feedback Test Wire Drive Motor and Tachometer Feedback Test Test Procedure Test for Feedback Voltage to the Control Board Test for Supply Voltage to TachometerNormal Open Circuit Voltage Waveform Scope SettingsTypical Output Voltage Waveform Machine Loaded Machine Loaded to 250 Amps AT 26 VDC Scope SettingsMachine Loaded to 220 Amps AT 22 VDC Scope Settings Troubleshooting & Repair Typical SCR Gate Voltage Waveform Materials Needed Control PC Board Removal and ReplacementRemoval and Replacement Procedure Removal and REPLACE- Ment Procedure Wire Drive Assembly Removal and Replacement Figure F.11 Wire Drive Assembly Removal Wire Drive Assembly Removal and Replacement ProcedureSCR Output Rectifier Removal & Replacement Disconnection Heat Sink Lead Right side heat sink See Figure F.14Capacitor Bank Removal and Replacement Components Bank Removal ReplacementMain Transformer Removal and Replacement Power Switch FAN Motor and FAN Removal and Replacement Figure F.16 Fan Motor and Fan Removal Components FAN Motor and FAN Removal and Replacement ProcedureTroubleshooting & Repair 230/60 375 Wire Speed RangeOpen Circuit Voltage Input Volts/HertzWIRE-MATIC Table of Contents Electrical Diagrams Section WIRE-MATIC Electrical Diagrams Spool GUN Option Wiring Diagram 208/230 Code To Section Available from Lincoln Control PC Board G2332 Layout