TEST PROCEDURE
1.Disconnect main AC input power to the machine.
2.Disconnect Molex Plugs J3 and J6 from the G2332 Control Board. See Figure F.5.
J3
G2332
J9
J6
J4
J5
J1 | J7 | J10 |
|
|
J2
FIGURE F.5 - Control Board Molex Plug Locations for G2332 PC Control Board.
3.Verify that the capacitors have com- pletely discharged with an Analog
4.Disconnect leads X2 and X3 from the negative capacitor bank using a 1/2" open end wrench.
See Figure F. 6.
LEADS |
X2 AND X3 |
NEGATIVE |
CAPACITOR |
BANK |
BUSS BAR |
FIGURE F.6 - Location of Leads X2
and X3.
5.Separate leads X2 and X3 from the negative capacitor bank buss bar. Be sure there is no electrical con- tact. See Figure F.6.
NOTE: DO NOT DISASSEMBLE THE
SCR RECTIFIER HEAT SINK ASSEM-
BLY.
6.Construct the circuit shown in Figure F.7. One
a.Test the voltage level of the bat- tery. Short leads (A) and (C). Close switch