Emerson XDR user manual Fluorinated Greenhouse Gas Requirements, Maintenance

Page 37

Maintenance

9.0MAINTENANCE

Minimal maintenance is required to keep the Liebert XDR operating at optimal levels. The module should be cleaned and checked for damage. Suggested maintenance includes:

Cooling fins—Clean any dust and debris from the cooling fins, taking care not to bend them.

9.1Fluorinated Greenhouse Gas Requirements

Stationary air conditioning, refrigeration, heat pump equipment and stationary fire protection sys- tems in the European Community market and operating with fluorinated greenhouse gases (f-gas), such as R407C, R134a, R410A, must comply with the F-Gas Regulation: (EC) No. 842/2006 (F-gas). The regulation prohibits, among other actions, venting fluorinated greenhouse gases to the atmo- sphere.

The F-Gas Regulation requires operators to use all measures that are technically feasible and do not entail disproportionate cost to prevent leakage of these gases, to test for leakage regularly and to recover f-gas during equipment service and maintenance and before disposing of equipment.

Refer to the full regulation for additional details.

31

Image 37
Contents Liebert XDR Fluorinated Greenhouse Gas Requirements-European Union Important Safety GuidelinesTable of Contents Specifications Installation Checklist and System Fill for StartupFigures Page Component Locations and Model Number Nomenclature Example XDR20B1RInstallation Considerations Pre-Installation ChecksReferences Packing ListChecking and Unpacking Product/System DescriptionModule Handling Recyclable PackagingUnpacking the Module Removing packaging Remove Liebert XDR from pallet Removing the Liebert XDR from the PalletMove the Liebert XDR Liebert XDR DimensionsOverall dimensions with one-shot coupling pre-charged Overall dimensions with removable coupling Determining Placement in the Conditioned SpaceAirflow Generic airflow diagramMounting the Liebert XDR on the Rack-Mounting Kit Installing the Rack-Mounting Kit onto the RackDoor Safety Catch European Union Fluorinated Greenhouse Gas Requirements System Connection ConfigurationInsulation Connection Methods and PointsBrazing Preparations Hard-Piped Connection SizesRecommended Piping Size Refer to for details Leak-Checking and Evacuation Header SystemDegree Connection TOP View Male coupling on Liebert XD cooling module Tools RequiredHex body, union nut on one-shot coupling Connection Methods-Removable Couplings Removable couplings Return Main Supply Main Oil rings on header and Liebert XD Flex Pipe connectors Do not Overtighten Piping mains without Liebert XD Flex Pipe Disconnect a Liebert XD Flex Pipe from a Liebert XD SystemRemoving the Liebert XDR from a Cabinet Disconnecting the Liebert XD Flex Pipe from the Liebert XDRCharging with Refrigerant Checklist for Proper InstallationStarting the Liebert XD System Fluorinated Greenhouse Gas Requirements MaintenanceSpecifications Page Ne t