Installation Checklist and System Fill for Startup

7.0INSTALLATION CHECKLIST AND SYSTEM FILL FOR STARTUP

7.1Checklist for Proper Installation

___ 1. Liebert XDR modules are securely attached to the cabinet and aligned properly with the rack.

___ 2. Check to ensure there are no obstructions that prevent the Liebert XDR from opening.

___ 3. Piping from Liebert XDP or Liebert XDC, with isolation valves, is properly connected to each Liebert XDR module.

___ 4. Liebert XD Flex Pipe couplings to prefabricated header assembly are secure and according to specifications.

___ 5. System checked for leakage.

___ 6. Check the R-134a refrigerant charge (see the user manual for either the Liebert XDP, SL-16671 or the Liebert XDC, SL-16644; each is available on the Liebert Web site, www.liebert.com).

___ 7. Run system and verify that the Liebert XDP or Liebert XDC and the Liebert XDR modules operate properly.

___ 8. Piping is insulated.

7.2Charging with Refrigerant

The Liebert XD system must be completely installed before it is charged with refrigerant. After installation is complete, refer to the Liebert XDP or Liebert XDC user manual for instructions on charging Liebert XD modules with refrigerant and the starting of the system. The complete Liebert XD system includes all Liebert XD cooling modules, a Liebert XDC or Liebert XDP and any other con- nected equipment.

29

Image 35
Contents Liebert XDR Fluorinated Greenhouse Gas Requirements-European Union Important Safety GuidelinesTable of Contents Specifications Installation Checklist and System Fill for StartupFigures Page Component Locations and Model Number Nomenclature Example XDR20B1RPacking List Pre-Installation ChecksInstallation Considerations ReferencesChecking and Unpacking Product/System DescriptionModule Handling Recyclable PackagingUnpacking the Module Removing packaging Remove Liebert XDR from pallet Removing the Liebert XDR from the PalletMove the Liebert XDR Liebert XDR DimensionsOverall dimensions with one-shot coupling pre-charged Overall dimensions with removable coupling Determining Placement in the Conditioned SpaceAirflow Generic airflow diagramMounting the Liebert XDR on the Rack-Mounting Kit Installing the Rack-Mounting Kit onto the RackDoor Safety Catch European Union Fluorinated Greenhouse Gas Requirements System Connection ConfigurationInsulation Connection Methods and PointsRecommended Piping Size Hard-Piped Connection SizesBrazing Preparations Refer to for details Leak-Checking and Evacuation Header SystemDegree Connection TOP View Male coupling on Liebert XD cooling module Tools RequiredHex body, union nut on one-shot coupling Connection Methods-Removable Couplings Removable couplings Return Main Supply Main Oil rings on header and Liebert XD Flex Pipe connectors Do not Overtighten Piping mains without Liebert XD Flex Pipe Disconnect a Liebert XD Flex Pipe from a Liebert XD SystemRemoving the Liebert XDR from a Cabinet Disconnecting the Liebert XD Flex Pipe from the Liebert XDRCharging with Refrigerant Checklist for Proper InstallationStarting the Liebert XD System Fluorinated Greenhouse Gas Requirements MaintenanceSpecifications Page Ne t