3.2.3Unpacking the Module

! WARNING

Risk of 130-pound (59 kg) module falling. Can cause equipment damage, personal injury or death.

Do not leave a Liebert XDR standing unattended on its side or its end without adequate support to prevent it from falling over. The Liebert XDR must be supported at all times or laid flat on protective material until it is installed.

Two properly trained and qualified people are required to move the module.

Do not unpack the Liebert XDR before moving it to the installation location. Once at the installation point:

1.Cut the banding and place all packaged modules on the floor for unpacking.

2.Unbend all metal tabs as shown in Figure 5.

Use any of these tools to unbend the tabs: flat-blade screwdriver, claw hammer, pliers or crowbar.

3.Remove the top cover from the package.

4.Remove the center top brace.

5.Remove and set aside the hardware and key package.

6.Remove side panels from package.

7.Remove top protective foam from the package.

5

Image 11
Contents Liebert XDR Fluorinated Greenhouse Gas Requirements-European Union Important Safety GuidelinesTable of Contents Specifications Installation Checklist and System Fill for StartupFigures Page Component Locations and Model Number Nomenclature Example XDR20B1RPacking List Pre-Installation ChecksInstallation Considerations ReferencesChecking and Unpacking Product/System DescriptionModule Handling Recyclable PackagingUnpacking the Module Removing packaging Remove Liebert XDR from pallet Removing the Liebert XDR from the PalletMove the Liebert XDR Liebert XDR DimensionsOverall dimensions with one-shot coupling pre-charged Overall dimensions with removable coupling Determining Placement in the Conditioned SpaceAirflow Generic airflow diagramMounting the Liebert XDR on the Rack-Mounting Kit Installing the Rack-Mounting Kit onto the RackDoor Safety Catch European Union Fluorinated Greenhouse Gas Requirements System Connection ConfigurationInsulation Connection Methods and PointsRecommended Piping Size Hard-Piped Connection SizesBrazing Preparations Refer to for details Leak-Checking and Evacuation Header SystemDegree Connection TOP View Male coupling on Liebert XD cooling module Tools RequiredHex body, union nut on one-shot coupling Connection Methods-Removable Couplings Removable couplings Return Main Supply Main Oil rings on header and Liebert XD Flex Pipe connectors Do not Overtighten Piping mains without Liebert XD Flex Pipe Disconnect a Liebert XD Flex Pipe from a Liebert XD SystemRemoving the Liebert XDR from a Cabinet Disconnecting the Liebert XD Flex Pipe from the Liebert XDRCharging with Refrigerant Checklist for Proper InstallationStarting the Liebert XD System Fluorinated Greenhouse Gas Requirements MaintenanceSpecifications Page Ne t