Important Note
Before applying power to the control panel, all wiring to the panel should be per NEC. Specifically check for proper voltage and that the neutral is grounded at the source. An equipment ground should also be run to the panel.
*See Wiring Instructions and Diagrams before proceeding.
Before
3