5-6. Sequence Of Gas Metal Arc Welding (GMAW) – Continuous Or Spot
Install & | Put On |
| Turn On Gas | Turn On Feeder | Begin Welding |
Connect | Personal Safety | Set Controls | And Water (If | And Welding | |
Equipment | Equipment |
| Applicable) | Power Source |
|
ssb6.1* 9/92
SECTION 6 – MAINTENANCE & TROUBLESHOOTING
Y Disconnect power |
| . Maintain more often |
before maintaining. |
| during severe conditions. |
4 To 6 Weeks |
| |
Apply Conductive Grease To |
|
|
Drive Roll Screw (See |
|
|
Sections |
|
|
Conductive |
|
|
Grease |
|
|
3 Months |
|
|
Replace | Clean |
|
And | Replace Damaged | |
Damaged Or | Tighten | |
Unreadable | Weld | Gas Hose |
Labels | Terminals |
|
|
| Repair Or Replace |
|
| Cracked Cables |
|
| And Cords |
6 Months |
|
|
Blow Out Or |
| Clean |
| Drive | |
Vacuum Inside |
| |
| Rolls | |
|
|