Dukane 403-570-01 user manual Energy Method, Orientation Option

Page 42

Dual Servo Spin Welder User’s Manual

Energy Method

In this method, weld duration is controlled by the amount of energy input into the weld joint as determined by the spin torque and angular rotation. The welder will maintain a constant spin speed until the programmed energy is produced. Then the tool will decelerate and stop. The Weld Parameters button is used to enter the settings shown in Figure 5-16.The Energy (J) field specifies the weld energy in Joules. As a safety measure, using the Energy Method requires that the Weld Time Process Limit be enabled (To set this limit, refer to the Process Limits description in the POST-WELD menu later in this manual.). If the Upper Weld Time Limit is exceeded during the weld, the machine will stop the cycle and report an error. The VERT Speed (mm/s), SPIN RPM, and Dir. fields are the same as in the Time Method. Press DONE to return to the main WELD tab screen.

WELD OPTIONS

Several weld options are available, any combination of which may be enabled simultaneously.

Orientation Option

With this option you can specify the upper tool’s angular stopping orientation at the end of the weld. To enable it, press the Orientation button and then the Enable box on the screen shown in Figure 5-17. The final weld orientation is defined in the Weld field. Two methods set this value: 1) direct numeric entry into the Weld field, or 2) visual alignment by jogging the spin tool to the desired orientation. To jog the spin tool, select the SPIN Jog Speed (Low, Medium, or High) and the jog direction (JOG + or JOG -). Then activate both RUN switches to rotate the tool. The current spin tool orientation is shown in the Jog Pos.. (Deg..) box. Once the head is in the desired orientation, use the Transfer arrow button to set this value as the final Weld orientation. To aid in visually setting the orientation, the press can be jogged vertically by selecting the DOWN or UP buttons and activating both RUN switches. The Move To button allows the spin tool to be rotated to the programmed Weld orientation. After selecting this button, activate both RUN switches until the spin tool stops moving. Press DONE to return to the main WELD tab screen.

Figure 5–16Weld Parameters Screen for Energy Method

Figure 5–17Weld Orientation Option Screen

Page  36

Dukane Manual Part No. 403-570-01

Image 42
Contents Dual Servo Spin Welder Dukane Manual Part No Revision History RevisionSummary Date This page intentionally left blank Contents Dukane Dual Servo Spin WelderThis page intentionally left blank Section IntroductionDukane Manual Part No Important User Information Read This Manual FirstDrawings and Tables Dual Servo Spin Welder Overview SVT042VRKey Dual Servo Spin Welder Features This page intentionally left blank Safety Considerations This page intentionally left blank Health and Safety Tips  CautionRun Switches General SafetyPlastics Health Notice Electrical Safety Mechanical SafetyAC Power Receptacle This page intentionally left blank Unpacking and Setup This page intentionally left blank Work Area Unpacking WelderPacking List Qty Part NumberLeveling Securing to Work BenchBench Capacity Mounting HolesDimensions are in Inches mm Tooling Hub & FixtureAC Power 20-Amp 240V FigureBase Interface Connector Head Height AdjustmentControl Connectors User I/O ConnectorThis page intentionally left blank Display and Controls This page intentionally left blank Touch Screen Display 1Dual Servo Spin Welder Touch Screen PanelOperational Switches Emergency Stop SwitchData I/O Connector Opti-Touch Run SwitchesBrigtly Lit Red LEDs This page intentionally left blank Touch Screen Menus View PartsThis page intentionally left blank RUN Mode Screen LayoutView Parts Setup Menu PRE-WELD SetupTool Setup TOP of Stroke Position Trigger PositionPart Pickup Option Pre-Spin Orientation OptionWeld Setup Weld Method SelectionTime Method Rotation Method Distance MethodEnergy Method Orientation OptionTorque Trigger Option 18Weld Torque Trigger Option ScreenPOST-WELD Setup Hold SetupConstant Torque Option 22Hold Setup Screen for Distance Mode Part Tests 25Process Limit Definitions Screen 128RUN Screen with Part Test Failed Button Select Setup Tab Tools MenuUtilities Tab System Setup Tab Third tab is labeled System Setup and is shown in Figure34Vertical Lower Limit Setup Screen with Set Position Button 35Password-Protected Screens and Menus Setting Time and Date On Touch Screen Screen Parameter Name Min.Value Max.Value Resolution Units Parameter Value RangeThis page intentionally left blank Machine Operation 55-56This page intentionally left blank Adjust Thruster Position on Column Machine SetupAC Power Base Interface CableSet Tool Parameters Reset E-StopTurn Power on Initialize Home WelderSet Vertical Travel Lower Limit Position Set Weld Process ParametersStarting a Weld Cycle Setup Sheet Stopping a Weld CycleDual Servo Spin Welder Setup Sheet Optimizing Performance This page intentionally left blank Spin Welding Process Material ConsiderationsControl Parameters Surface SpeedSpin Rev/minSpeed Average Weld Diameter inchPress Axial Speed Weld DepthPart Size HoldWeld Diameter Machine Peak RPM This page intentionally left blank Installation, Startup Welder Data Export SoftwareThis page intentionally left blank Installation Startup, and Cable Connections Hardware Software RequirementsPart Data Part Data ListIncoming Data Profile GraphsFile Write Plot DataServo and Debug Spin Torque SetpointTroubleshooting Welding ProcessThis page intentionally left blank Troubleshooting Welding ProcessWelder MechanicalProblem Symptom Possible Cause Recommended Solution Message Description Cause Possible Solution Instructions FaultsMessage Description Cause Possible Solution Message Description Cause Possible Solution Errors Time or number of rotationsMessage Description Cause Possible Solution This page intentionally left blank Maintenance This page intentionally left blank AC Power Cord MaintenanceThis page intentionally left blank Contacting Dukane This page intentionally left blank Ultrasonics Division Contacting DukaneIdentify Equipment WebsiteThis page intentionally left blank Specifications This page intentionally left blank Power Requirements Tooling SpecificationsMachine Weight Operating Environment2Dual Servo Spin Welder Dimensions Identification Numbers Welder Model & Serial NumberThis page intentionally left blank Connector Pinouts Appendix aThis page intentionally left blank Base Interface Connector Figure A-1Base Interface ConnectorUser I/O Connector Signal Description FunctionSlide Kit Connector Pin Signal Description FunctionData Port Connector Automation WiringFigure A-5Schematic of Operate and Abort This page intentionally left blank Appendix B ToolingThis page intentionally left blank Moment of Inertia Explanation of InertiaTool and Fixture Design Optional Features Appendix CThis page intentionally left blank Upper Tool Vacuum Figure C-1Upper Tool Vacuum SystemRemote Touch Screen Figure C-2 Remote Touch Screen ComponentsDukane ISO