Dual Servo Spin Welder User’s Manual

bad part means one or more of the measured parameters was not within the limits set for the weld cycle. The Time and Date fields indicate the time and date the part was welded.

Just below the WELD label, there are a number of fields with weld data for the last cycle. The displayed data lists the:

Time - Weld time (seconds)

Rotations - Number of spin motor rotations during weld

Peak RPM - Peak spin motor speed (RPM)

Peak Torque - Peak spin motor torque (% of maximum torque)

Energy - Weld energy (Joules)

Orient.. - Welded part angular orientation

(degrees)

Weld End - Weld end vertical position (mm)

Peak Thrust - Peak vertical actuator thrust (% of maximum thrust)

Hold End - Hold end vertical position (mm)

Hold Col - Hold collapse distance (mm)

Cycle - Total cycle time (seconds)

VIEW PARTS

The Part Data button on the right side of the screen displays seven part reports at a time. Each report occupies two lines and displays the same information reported on the RUN screen. The report starts with the last cycle at the bottom and works backwards toward the top. This is shown in Figure 5–3. The Page Up and Page Down buttons permit you to scroll through part data one screen at a time, Press the RUN button to return to the RUN screen.

Figure 5–3VIEW PARTS Screen

Page  30

Dukane Manual Part No. 403-570-01

Image 36
Contents Dual Servo Spin Welder Dukane Manual Part No Revision History RevisionSummary Date This page intentionally left blank Contents Dukane Dual Servo Spin WelderThis page intentionally left blank Section IntroductionDukane Manual Part No Important User Information Read This Manual FirstDrawings and Tables Dual Servo Spin Welder Overview SVT042VRKey Dual Servo Spin Welder Features This page intentionally left blank Safety Considerations This page intentionally left blank Health and Safety Tips  CautionRun Switches General SafetyPlastics Health Notice Electrical Safety Mechanical SafetyAC Power Receptacle This page intentionally left blank Unpacking and Setup This page intentionally left blank Unpacking Welder Packing ListWork Area Qty Part NumberSecuring to Work Bench Bench CapacityLeveling Mounting HolesDimensions are in Inches mm Tooling Hub & FixtureAC Power 20-Amp 240V FigureHead Height Adjustment Control ConnectorsBase Interface Connector User I/O ConnectorThis page intentionally left blank Display and Controls This page intentionally left blank Touch Screen Display 1Dual Servo Spin Welder Touch Screen PanelOperational Switches Emergency Stop SwitchData I/O Connector Opti-Touch Run SwitchesBrigtly Lit Red LEDs This page intentionally left blank Touch Screen Menus View PartsThis page intentionally left blank RUN Mode Screen LayoutView Parts Setup Menu PRE-WELD SetupTool Setup TOP of Stroke Position Trigger PositionPart Pickup Option Pre-Spin Orientation OptionWeld Setup Weld Method SelectionTime Method Rotation Method Distance MethodEnergy Method Orientation OptionTorque Trigger Option 18Weld Torque Trigger Option ScreenPOST-WELD Setup Hold SetupConstant Torque Option 22Hold Setup Screen for Distance Mode Part Tests 25Process Limit Definitions Screen 128RUN Screen with Part Test Failed Button Select Setup Tab Tools MenuUtilities Tab System Setup Tab Third tab is labeled System Setup and is shown in Figure34Vertical Lower Limit Setup Screen with Set Position Button 35Password-Protected Screens and Menus Setting Time and Date On Touch Screen Screen Parameter Name Min.Value Max.Value Resolution Units Parameter Value RangeThis page intentionally left blank Machine Operation 55-56This page intentionally left blank Machine Setup AC PowerAdjust Thruster Position on Column Base Interface CableReset E-Stop Turn Power onSet Tool Parameters Initialize Home WelderSet Vertical Travel Lower Limit Position Set Weld Process ParametersStarting a Weld Cycle Setup Sheet Stopping a Weld CycleDual Servo Spin Welder Setup Sheet Optimizing Performance This page intentionally left blank Spin Welding Process Material ConsiderationsControl Parameters Surface SpeedRev/min SpeedSpin Average Weld Diameter inchPress Axial Speed Weld DepthPart Size HoldWeld Diameter Machine Peak RPM This page intentionally left blank Installation, Startup Welder Data Export SoftwareThis page intentionally left blank Installation Startup, and Cable Connections Hardware Software RequirementsPart Data Part Data ListProfile Graphs File WriteIncoming Data Plot DataServo and Debug Spin Torque SetpointTroubleshooting Welding ProcessThis page intentionally left blank Troubleshooting Welding ProcessWelder MechanicalProblem Symptom Possible Cause Recommended Solution Message Description Cause Possible Solution Instructions FaultsMessage Description Cause Possible Solution Message Description Cause Possible Solution Errors Time or number of rotationsMessage Description Cause Possible Solution This page intentionally left blank Maintenance This page intentionally left blank AC Power Cord MaintenanceThis page intentionally left blank Contacting Dukane This page intentionally left blank Contacting Dukane Identify EquipmentUltrasonics Division WebsiteThis page intentionally left blank Specifications This page intentionally left blank Tooling Specifications Machine WeightPower Requirements Operating Environment2Dual Servo Spin Welder Dimensions Identification Numbers Welder Model & Serial NumberThis page intentionally left blank Connector Pinouts Appendix aThis page intentionally left blank Base Interface Connector Figure A-1Base Interface ConnectorUser I/O Connector Signal Description FunctionSlide Kit Connector Pin Signal Description FunctionData Port Connector Automation WiringFigure A-5Schematic of Operate and Abort This page intentionally left blank Appendix B ToolingThis page intentionally left blank Moment of Inertia Explanation of InertiaTool and Fixture Design Optional Features Appendix CThis page intentionally left blank Upper Tool Vacuum Figure C-1Upper Tool Vacuum SystemRemote Touch Screen Figure C-2 Remote Touch Screen ComponentsDukane ISO