Table 13 — Approximate Fluid Volume (gal)
per 100 ft of Pipe
| PIPE |
| DIAMETER (in.) | VOLUME (gal.) |
| Copper |
| 1 | 4.1 |
|
|
| 1.25 | 6.4 |
|
|
| 1.5 | 9.2 |
| Rubber Hose |
| 1 | 3.9 |
| Polyethylene |
| 3/4 IPS SDR11 | 2.8 |
|
|
| 1 IPS SDR11 | 4.5 |
|
|
| 11/4 IPS SDR11 | 8.0 |
|
|
| 1/2 IPS SDR11 | 10.9 |
|
|
| 2 IPS SDR11 | 18.0 |
|
|
| 11/4 IPS SCH40 | 8.3 |
|
|
| 11/2 IPS SCH40 | 10.9 |
|
|
| 2 IPS SCH40 | 17.0 |
| LEGEND |
|
| |
IPS | — Internal Pipe Size |
|
| |
SCH | — Schedule |
|
| |
SDR | — Standard Dimensional Ratio |
|
NOTE: Volume of heat exchanger is approximately 1.0 gallon.
Table 14 — Antifreeze Percentages by Volume
| MINIMUM TEMPERATURE FOR FREEZE | ||||
ANTIFREEZE |
| PROTECTION (F) |
| ||
| 10 | 15 | 20 | 25 | |
Methanol (%) | 25 | 21 | 16 | 10 | |
100% USP Food Grade | 38 | 30 | 22 | 15 | |
Propylene Glycol (%) | |||||
|
|
|
|
Cooling Tower/Boiler Systems — These systems typically use a common loop maintained at 60 to 90 F. Carrier recommends using a closed circuit evaporative cooling tower with a secondary heat exchanger between the tower and the water loop. If an open type cooling tower is used continuously, chemical treatment and filtering will be necessary.
Ground Coupled, Closed Loop and Plateframe Heat Exchanger Well Systems — These systems al- low water temperatures from 30 to 110 F. The external loop field is divided up into 2 in. polyethylene supply and return lines. Each line has valves connected in such a way that upon system
OPERATION
Power Up Mode — The unit will not operate until all the inputs, terminals and safety controls are checked for normal operation.
NOTE: The compressor will have a
Units with Aquazone™ Complete C Control
STANDBY — The Y and W terminals are not active in Stand- by mode, however the O and G terminals may be active, de- pending on the application. The compressor will be off.
COOLING — The Y and O terminals are active in Cooling mode. After power up, the first call to the compressor will ini- tiate a 5 to
NOTE: On all subsequent compressor calls the random start delay is omitted.
HEATING STAGE 1 — Terminal Y is active in Heating Stage 1. After power up, the first call to the compressor will initiate a 5 to
NOTE: On all subsequent compressor calls the random start delay is omitted.
HEATING STAGE 2 — To enter Stage 2 mode, terminal W is active (Y is already active). Also, the G terminal must be active
or the W terminal is disregarded. The compressor relay will re- main on and EH1 (emergency heat) is immediately turned on. EH2 will turn on after 10 minutes of continual Stage 2 demand.
NOTE: EH2 will not turn on (or if on, will turn off) if FP1 (freeze protection) temperature is greater than 45 F and FP2 is greater than 110 F.
EMERGENCY HEAT — In Emergency Heat (EH) mode, terminal W is active while terminal Y is not. Terminal G must be active or the W terminal is disregarded. EH1 is immediately turned on. EH2 will turn on after 5 minutes of continuous emergency heat demand.
Units with Aquazone Deluxe D Control
STANDBY/FAN ONLY — The compressor will be off. The fan enable, fan speed, and reversing valve (RV) relays will be on if inputs are present. If there is a Fan 1 demand, the fan enable will immediately turn on. If there is a Fan 2 demand, the fan enable and fan speed will immediately turn on.
NOTE: DIP switch 5 on S1 does not have an effect upon Fan 1 and Fan 2 outputs.
HEATING STAGE 1 — In Heating Stage 1 mode, the fan en- able and compressor relays are turned on immediately. Once the demand is removed, the relays are turned off and the con- trol reverts to Standby mode. If there is a master/slave or dual compressor application, all compressor relays and related functions will operate per their associated DIP switch 2 setting on S1.
HEATING STAGE 2 — In Heating Stage 2 mode, the fan en- able and compressor relays remain on. The fan speed relay is turned on immediately and turned off immediately once the de- mand is removed. The control reverts to Heating Stage 1 mode. If there is a master/slave or dual compressor application, all compressor relays and related functions will operate per their associated DIP switch 2 setting on S1.
HEATING STAGE 3 — In Heating Stage 3 mode, the fan en- able, fan speed and compressor relays remain on. The EH1 out- put is turned on immediately. With continuing Heat Stage 3 de- mand, EH2 will turn on after 10 minutes. EH1 and EH2 are turned off immediately when the Heating Stage 3 demand is re- moved. The control reverts to Heating Stage 2 mode.
Output EH2 will be off if FP1’s temperature is greater than
45 F AND FP2 (when shorted) is greater than 110 F during Heating Stage 3 mode. This condition will have a
EMERGENCY HEAT — In Emergency Heat mode, the fan enable and fan speed relays are turned on. The EH1 output is turned on immediately. With continuing emergency heat de- mand, EH2 will turn on after 5 minutes. Fan enable and fan speed relays are turned off after a
Output EH1, EH2, fan enable, and fan speed will be ON if the G input is not active during Emergency Heat mode.
COOLING STAGE 1 — In Cooling Stage 1 mode, the fan enable, compressor and RV relays are turned on immediately. If configured as stage 2 (DIP switch set to OFF) then the com- pressor and fan will not turn on until there is a stage 2 demand. The fan enable and compressor relays are turned off immedi- ately when the Cooling Stage 1 demand is removed. The con- trol reverts to Standby mode. The RV relay remains on until there is a heating demand. If there is a master/slave or dual compressor application, all compressor relays and related func- tions will track with their associated DIP switch 2 on S1.
COOLING STAGE 2 — In Cooling Stage 2 mode, the fan enable, compressor and RV relays remain on. The fan speed re- lay is turned on immediately and turned off once the Cooling Stage 2 demand is removed. The control reverts to Cooling Stage 1 mode. If there is a master/slave or dual compressor
40