Juniper Networks C2000, C4000 manual Installation Guidelines and Requirements

Page 57

Chapter 9

Installation Guidelines and Requirements

This chapter reviews preinstallation considerations such as electrical, environmental, and safety compliances for the C-series platforms. For complete system specifications, see “System Specifications” on page 35.

This chapter contains the following topics:

Your Preinstallation Responsibilities on page 43

Environmental Requirements on page 44

Regulatory Compliances on page 44

Safety Guidelines on page 45

Equipment Rack Requirements on page 46

Cabling Recommendations on page 47

Product Reclamation and Recycling Program on page 48

Hardware Compliance on page 49

Your Preinstallation Responsibilities

Complete the following tasks before installing the system:

Verify that the electrical supply meets all AC and DC power requirements. See System Specifications on page 35.

Verify that the site meets all environment specifications. See “Environmental Requirements” on page 44 and “System Specifications” on page 35.

Verify that the cables you plan to use meet the specifications, and review the cabling recommendations. See Cabling Recommendations on page 47.

Verify the operation of all telephone circuits, digital services, and T1 facilities required for installation.

Ensure that all IP requirements are met, such as IP addresses, subnet masks, and any specific routing protocol information.

Your Preinstallation Responsibilities

43

Image 57
Contents C2000 and C4000 Hardware Guide Series Platforms Hardware Guide End User License Agreement IiiPage Table of Contents Chapter Setting the Initial Configuration Part Hardware Maintenance Procedures and SpecificationsChapter Managing RAID Disks on a C-series Platform Part Index About This Guide ObjectivesAudience Text Conventions Documentation ConventionsUser@host# set local-address Related Juniper Networks DocumentationCore Documentation Set Juniper Networks C-series and SRC Technical PublicationsDocumentation Feedback Obtaining DocumentationRequesting Support Product Overview C2000 and C4000 1.0.x Hardware Guide Product Overview Series Platform Overview System DescriptionSeries Platform Models C2000, Front View Series Model DifferencesC4000, Rear View Series Model ComponentsCLI Management Network Management ToolsSnmp MIB Management Page Initial Installation C2000 and C4000 1.0.x Hardware Guide Initial Installation Before You Begin Unpacking and Inspecting the C-series PlatformUnpacking the Units Inspecting System Components and AccessoriesIf You Detect or Suspect Damage Contacting Juniper NetworksFreestanding Installation Installing and Cabling the C-series PlatformInstallation Guidelines Rack-Mounted InstallationInstalling the System Preparing the Equipment RacksCabling the Management Console Cabling the SystemCabling Ethernet Interfaces Cabling the System for PowerC2000, Front View Next Step Powering Up Powering Up the C-series PlatformModel LEDs Status LEDsSetting the Initial Configuration Configuration OverviewSetting Up Management Access and Logging Configuring the Juniper Networks Database Edit Root@host# set system host-name my-hostname Configuring Hostname and Domain ParametersConfiguring the System for Remote Access Configuring the System to Accept SSH and Telnet Connections Adding an Admin User Account Set the password of the user C2000 and C4000 1.0.x Hardware Guide Next Step Hardware Maintenance Procedures and Specifications Page Required Tools and Items Maintaining the SystemCleaning the System Removing and Installing a FanStoring Modules and Components Removing and Installing a Power Supply Module Removing and Installing a Hard Drive System Specifications C2000 Model SpecificationsC2000 Model Specifications C4000 Model Specifications C4000 Model SpecificationsSystem Specifications Page Series Platform Data Storage Managing RAID Disks on a C-series Platform Replacing a Disk Managing Disks in a C-series PlatformViewing Information About Disks on a C-series Platform Reinitializing an Active DiskField Name Field Description Show disk status Output FieldsYour Preinstallation Responsibilities Installation Guidelines and RequirementsRegulatory Compliances Environmental RequirementsSafety Guidelines Mechanical Requirements Equipment Rack RequirementsProper Rack Installation Space RequirementsCabling Recommendations Product Reclamation and Recycling Program Hardware Compliance Federal Communications Commission FCC StatementFCC Requirements for Consumer Products Avis CS-03 dIndustrie Canada Industry Canada Notice CS-03C. Explanatory Notes Equipment Attachment Limitations EC Declaration of Conformity Return Procedure Contacting Customer Support and Returning HardwareContacting Customer Support Information You Might Need to Supply to Jtac Locating Component Serial NumbersReturning Products for Repair or Replacement Tools and Parts RequiredPacking Instructions for Returning a Chassis Remove the chassis from the rack Declaration of Conformity Declaration of ConformityPage Index C2000 and C4000 1.0.x Hardware Guide Index Compliance Manuals