Chapter 3
Installing and Cabling the C-series Platform
This chapter describes how to install the
■Before You Begin on page 13
■Freestanding Installation on page 13
■
■Cabling the System on page 15
■The Next Step on page 18
Before You Begin
Before installing the system, be sure you:
■Have a plan for installing the system that takes into consideration future expansion.
■Have the tools and accessories needed to complete the installation.
■Read and understand the clearance requirements for the front and back of the chassis for cable routing and other unit access. See Environmental Requirements on page 44 for more information.
■Read and understand the clearance requirements for the top and bottom of the chassis to ensure adequate ventilation.
■Prepare the equipment racks by measuring and marking space for each system you plan to install.
Freestanding Installation
When installing the system on a table top or in any other freestanding mode, be sure to leave enough space around the system for adequate ventilation. Position the
Before You Begin ■ 13