Juniper Networks C2000 Installing and Cabling the C-series Platform, Freestanding Installation

Page 27

Chapter 3

Installing and Cabling the C-series Platform

This chapter describes how to install the C-series platform and attach cables. It contains the following topics:

Before You Begin on page 13

Freestanding Installation on page 13

Rack-Mounted Installation on page 14

Cabling the System on page 15

The Next Step on page 18

Before You Begin

Before installing the system, be sure you:

Have a plan for installing the system that takes into consideration future expansion.

Have the tools and accessories needed to complete the installation.

Read and understand the clearance requirements for the front and back of the chassis for cable routing and other unit access. See Environmental Requirements on page 44 for more information.

Read and understand the clearance requirements for the top and bottom of the chassis to ensure adequate ventilation.

Prepare the equipment racks by measuring and marking space for each system you plan to install.

Freestanding Installation

When installing the system on a table top or in any other freestanding mode, be sure to leave enough space around the system for adequate ventilation. Position the

Before You Begin 13

Image 27
Contents C2000 and C4000 Hardware Guide Series Platforms Hardware Guide End User License Agreement IiiPage Table of Contents Chapter Setting the Initial Configuration Part Hardware Maintenance Procedures and SpecificationsChapter Managing RAID Disks on a C-series Platform Part Index About This Guide ObjectivesAudience Text Conventions Documentation ConventionsUser@host# set local-address Related Juniper Networks DocumentationCore Documentation Set Juniper Networks C-series and SRC Technical PublicationsDocumentation Feedback Obtaining DocumentationRequesting Support Product Overview C2000 and C4000 1.0.x Hardware Guide Product Overview Series Platform Overview System DescriptionSeries Platform Models C2000, Front View Series Model DifferencesC4000, Rear View Series Model ComponentsCLI Management Network Management ToolsSnmp MIB Management Page Initial Installation C2000 and C4000 1.0.x Hardware Guide Initial Installation Before You Begin Unpacking and Inspecting the C-series PlatformContacting Juniper Networks Inspecting System Components and AccessoriesUnpacking the Units If You Detect or Suspect DamageFreestanding Installation Installing and Cabling the C-series PlatformPreparing the Equipment Racks Rack-Mounted InstallationInstallation Guidelines Installing the SystemCabling the Management Console Cabling the SystemCabling Ethernet Interfaces Cabling the System for PowerC2000, Front View Next Step Powering Up Powering Up the C-series PlatformModel LEDs Status LEDsSetting the Initial Configuration Configuration OverviewSetting Up Management Access and Logging Configuring the Juniper Networks Database Edit Root@host# set system host-name my-hostname Configuring Hostname and Domain ParametersConfiguring the System for Remote Access Configuring the System to Accept SSH and Telnet Connections Adding an Admin User Account Set the password of the user C2000 and C4000 1.0.x Hardware Guide Next Step Hardware Maintenance Procedures and Specifications Page Required Tools and Items Maintaining the SystemCleaning the System Removing and Installing a FanStoring Modules and Components Removing and Installing a Power Supply Module Removing and Installing a Hard Drive System Specifications C2000 Model SpecificationsC2000 Model Specifications C4000 Model Specifications C4000 Model SpecificationsSystem Specifications Page Series Platform Data Storage Managing RAID Disks on a C-series PlatformReplacing a Disk Managing Disks in a C-series PlatformViewing Information About Disks on a C-series Platform Reinitializing an Active DiskField Name Field Description Show disk status Output FieldsYour Preinstallation Responsibilities Installation Guidelines and RequirementsRegulatory Compliances Environmental RequirementsSafety Guidelines Mechanical Requirements Equipment Rack RequirementsProper Rack Installation Space RequirementsCabling Recommendations Product Reclamation and Recycling Program Hardware Compliance Federal Communications Commission FCC StatementFCC Requirements for Consumer Products Avis CS-03 dIndustrie Canada Industry Canada Notice CS-03C. Explanatory Notes Equipment Attachment Limitations EC Declaration of Conformity Return Procedure Contacting Customer Support and Returning HardwareContacting Customer Support Information You Might Need to Supply to Jtac Locating Component Serial NumbersReturning Products for Repair or Replacement Tools and Parts RequiredPacking Instructions for Returning a Chassis Remove the chassis from the rack Declaration of Conformity Declaration of ConformityPage Index C2000 and C4000 1.0.x Hardware Guide Index Compliance Manuals