Juniper Networks C4000 Rack-Mounted Installation, Installation Guidelines, Installing the System

Page 28

C2000 and C4000 1.0.x Hardware Guide

system with easy access to the connections that it needs for power, local communications, and remote communications.

WARNING: Two people are required to lift the system.

CAUTION: To prevent electrostatic damage to the system and its components, make sure persons handling the system wear an antistatic device.

Rack-Mounted Installation

We recommend that you use a standard EIA distribution rack. See “Equipment Rack Requirements” on page 46 for rack information.

Installation Guidelines

Before installing the systems in a rack, consider the following guidelines:

You can install several models in a single 7-ft. (2.1-m) rack. Installing multiple systems in a single rack enables you to maximize your available space.

Install heavier systems on the bottom of the rack. Mount lighter systems higher in the rack.

Preparing the Equipment Racks

Following your installation plan, use a tape measure and marking pen to measure and mark space on each equipment rack for each system component. For horizontal spacing follow Network Equipment Building System (NEBS) requirements.

Installing the System

To complete the installation of the system in a rack, you need:

A Phillips screwdriver

Eight 10-32 x 3/8 Phillips screws (provided) for each model to be installed

To install the system in the rack:

14Rack-Mounted Installation

Image 28
Contents C2000 and C4000 Hardware Guide Series Platforms Hardware Guide Iii End User License AgreementPage Table of Contents Part Hardware Maintenance Procedures and Specifications Chapter Setting the Initial ConfigurationChapter Managing RAID Disks on a C-series Platform Part Index Objectives About This GuideAudience Documentation Conventions Text ConventionsRelated Juniper Networks Documentation User@host# set local-addressJuniper Networks C-series and SRC Technical Publications Core Documentation SetObtaining Documentation Documentation FeedbackRequesting Support Product Overview C2000 and C4000 1.0.x Hardware Guide Product Overview System Description Series Platform OverviewSeries Platform Models Series Model Differences C2000, Front ViewSeries Model Components C4000, Rear ViewNetwork Management Tools CLI ManagementSnmp MIB Management Page Initial Installation C2000 and C4000 1.0.x Hardware Guide Initial Installation Unpacking and Inspecting the C-series Platform Before You BeginInspecting System Components and Accessories Unpacking the UnitsIf You Detect or Suspect Damage Contacting Juniper NetworksInstalling and Cabling the C-series Platform Freestanding InstallationRack-Mounted Installation Installation GuidelinesInstalling the System Preparing the Equipment RacksCabling the System Cabling the Management ConsoleCabling the System for Power Cabling Ethernet InterfacesC2000, Front View Next Step Powering Up the C-series Platform Powering UpStatus LEDs Model LEDsConfiguration Overview Setting the Initial ConfigurationSetting Up Management Access and Logging Configuring the Juniper Networks Database Configuring Hostname and Domain Parameters Edit Root@host# set system host-name my-hostnameConfiguring the System for Remote Access Configuring the System to Accept SSH and Telnet Connections Adding an Admin User Account Set the password of the user C2000 and C4000 1.0.x Hardware Guide Next Step Hardware Maintenance Procedures and Specifications Page Maintaining the System Required Tools and ItemsRemoving and Installing a Fan Cleaning the SystemStoring Modules and Components Removing and Installing a Power Supply Module Removing and Installing a Hard Drive C2000 Model Specifications System SpecificationsC2000 Model Specifications C4000 Model Specifications C4000 Model SpecificationsSystem Specifications Page Managing RAID Disks on a C-series Platform Series Platform Data StorageManaging Disks in a C-series Platform Replacing a DiskReinitializing an Active Disk Viewing Information About Disks on a C-series PlatformShow disk status Output Fields Field Name Field DescriptionInstallation Guidelines and Requirements Your Preinstallation ResponsibilitiesEnvironmental Requirements Regulatory CompliancesSafety Guidelines Equipment Rack Requirements Mechanical RequirementsSpace Requirements Proper Rack InstallationCabling Recommendations Product Reclamation and Recycling Program Federal Communications Commission FCC Statement Hardware ComplianceFCC Requirements for Consumer Products Industry Canada Notice CS-03 Avis CS-03 dIndustrie CanadaC. Explanatory Notes Equipment Attachment Limitations EC Declaration of Conformity Contacting Customer Support and Returning Hardware Return ProcedureContacting Customer Support Locating Component Serial Numbers Information You Might Need to Supply to JtacTools and Parts Required Returning Products for Repair or ReplacementPacking Instructions for Returning a Chassis Remove the chassis from the rack Declaration of Conformity Declaration of ConformityPage Index C2000 and C4000 1.0.x Hardware Guide Index Compliance Manuals