Component | Quantity | Part number |
|
|
|
Side panel 50U kit | 1 | AN991A |
|
|
|
50U rack bracket kit | 21 | AP014A |
|
|
|
Either of the following busway dropbox and PDU kits: |
|
|
• Single phase HP POD busway dropbox kit | 30 | AP912A |
• Single phase <sci)short_name> PDU bracket kit | 88 | AQ684A |
|
| |
• Three phase HP POD busway dropbox kit | 30 | AS613A |
• Three phase HP POD PDU bracket kit | 88 | AQ683A |
|
|
|
Rack interface seal kit | 21 | AP013A |
|
|
|
The HP POD is delivered with heavy duty filler panels installed in every empty U space of the racks. However, HP recommends purchasing additional heavy duty filler panels (AF073A) to prevent compromising the integrity of the cold aisle set point temperature when IT equipment is removed for upgrades or maintenance.
The quantity and model of PDUs included with your HP POD are dependent on the IT equipment load they are supporting.
Preinstallation checklist
CAUTION: Tighten the electrical busway connections after the HP POD is in its final location and before you begin the installation process.
Before you begin the installation of your HP POD, verify the following action items have been completed:
•All components are delivered to your facility.
•The HP POD, transformer, switchboard, and water distribution kit are in their final locations.
•You must have facility power at your final location. You can provide the connection cables from the facility to the transformer and switchboard or purchase connection cables from HP at additional costs.
•You must have facility water at your final location. You can provide the connection hoses from the facility to the water distribution kit or purchase connection hoses from HP at additional costs.
•The HP POD has been properly grounded.
Required tools
•
•
•
•Screwdriver set
•Ratchet set
•Diagonal cutters
•
Installation 18