Leveling requirements
The site location for the HP POD must be level +/- 0.5 degree tolerance.
Grounding requirements
IMPORTANT: Before installing the HP POD, consult your local AHJ for applicable codes and to review
The HP POD must be grounded in accordance to local electric code. HP recommends grounding the HP POD, the transformer and switchboard, and the water distribution kit to your ground grid system for full protection.
Lightning protection
If the HP POD is installed in an outdoor environment, HP recommends hiring a lightning protection consultant to evaluate potential lightning risks and assess possible HP POD lightning protection schemes.
Component documentation
The Operations and Maintenance Manual, that includes all
Site requirements 9