Index
A
acceptable water quality specifications 30
air and water heat exchanger maintenance 54 air filter sensor 44, 54
alarms, BMS | 41 |
alarms, safety and security 42 | |
ASSD panel | 13, 14, 35, 36 |
B
before you contact HP 55 BMS 40, 41
BMS alarms 41
BMS panel 14, 35, 36 BSMI notice 57
building management system 40
building management system, connecting the POD 40
C
cables, FCC compliance | 56 |
Canadian notices 56 |
|
Chinese notice 58 |
|
commissioning the POD | 25 |
component health 10 |
|
component identification | 12 |
components 12 |
|
|
|
components, POD 12 |
|
| |
condensation management | 28, 30 | ||
connecting the POD to the BMS | 40 | ||
connecting the power 23 |
|
| |
connecting the water | 19 |
|
|
connections, facility | 7 |
|
|
considerations, environmental | 8 | ||
considerations, temperature | 8 |
| |
contact information | 55 |
|
|
contents 17 |
|
|
|
controlling the fan speed 27 cooling 27
cooling the POD 27
D
dimensions and weight 6 drains 28
E
electrical busway maintenance 54 electrical specifications 50 emergency components 13 environmental considerations 8 environmental specifications 53 EPMS panel 14, 35, 38
EPO panel 14, 35, 36, 37 European Union regulatory notice 56 exterior dimensions and weight 6
F
facility connections | 7 | ||
fan 27 |
|
|
|
fan control panel | 14, 35, 38 | ||
fan speed | 27 |
|
|
Federal Communications Commission (FCC) | |||
notice | 56 |
|
|
fire alarm control panel 13, 14, 35, 38 | |||
fire alarm sequence of operations 42 | |||
fire protection | 44 |
| |
fire suppression | 44 | ||
frequently asked questions 47 | |||
frost damage 31 |
|
G
grounding requirements 9
H
House panel 14, 35, 38 HP POD components 12 HP POD contents 17
HP POD emergency components 13 HP POD panel locations 14 humidifier 14, 35, 44
Index 61