Contents
Site requirements | 6 |
Optimum environment | 6 |
Location considerations | 6 |
Moving the HP POD | 6 |
System utilities | 6 |
Transformer, switchboard, and water distribution kit locations | 7 |
Work space requirements | 8 |
Environmental considerations | 8 |
Temperature considerations | 8 |
Leveling requirements | 9 |
Grounding requirements | 9 |
Lightning protection | 9 |
Component documentation | 9 |
Safety considerations | 10 |
Safety information | 10 |
Operator safety | 10 |
Component health | 10 |
Component identification | 12 |
HP POD components | 12 |
HP POD emergency components | 13 |
HP POD panel locations | 14 |
Transformer and switchboard components (optional) | 15 |
Water distribution kit components (optional) | 16 |
Installation | 17 |
HP POD contents | 17 |
Preinstallation checklist | 18 |
Required tools | 18 |
Installing the HP POD using the optional components | 19 |
Connecting the water | 19 |
Connecting the power | 23 |
Commissioning the HP POD | 25 |
Cooling system | 27 |
HP POD cooling system | 27 |
Water supply temperature | 27 |
Controlling the fan speed | 27 |
Condensation management | 28 |
HP POD drains | 28 |
Leak detection | 29 |
Water quality requirements | 30 |
Water quality requirements and specifications | 30 |
Acceptable water quality specifications | 30 |
Frost damage | 31 |
Plumbing materials to avoid | 31 |
Contents | 3 |