HP Performance Optimized Data Center (POD) 20cp manual Future expansions

Page 10

Side view clearances shown

Top view for multiple POD installation minimum clearances shown

Adequate space around the HP POD 20c is necessary for minimum door clearance.

These minimum clearances provide room for door opening only. Consider additional space as necessary for your site.

Future expansions

When selecting a site location, consider future space and accessibility requirements. Adequate space around the HP POD 20c is necessary for locating additional equipment within close proximity, such as generators and UPS devices. When installing additional equipment within close proximity to the HP POD 20c, consult with HP for site locations.

For specific space requirements, see "Dimensions and clearances (on page 8)."

Site requirements 10

Image 10
Contents Abstract Part Number March EditionPage Contents Appendix a HP site assessment Overview Safety and IEC complianceAbout this document Site assessment Site safety and securityFeature Specification Site preparation HP POD 20c capacity limitations Electrical power capacities critical IT power HP POD 20c capacities Overall system capacitiesSite requirements HP POD 20c weightDimensions and clearances Site padSite requirements Future expansions Grounding requirements Humidifier water supply UtilitiesFront view shown Drainage Requirement Location SpecificationChilled water supply Piping materials Power infrastructure installationParameter Range Electrical power system configuration Site electrical systemAdditional POD connections Supported facility connectionsEnvironmental control system Connection portalsHumidifier End view shownFire, safety, and access notifications HP POD 20c access controlFire box Demarcation box Supported facility connections Environmental risks Areas prone to lightning or power surgesEnvironmental considerations Cold weatherHP Site Preparation Drawing Package Site plan requirements and actionsCompleting a site assessment Zoning and permit requirementsHP POD 20c installation Site planningAssembly equipment locations Description HP POD 20c storage requirementsAdditional structures HP POD 20c site assessment checklist Appendix a HP site assessmentDescription Yes Initial Used as the basis for the evaluation. The delivery path isCustomer responsibilities Description Initial InformationAppendix B Preparing for delivery HP POD 20c site readiness checklistInstallation prerequisites Pre-delivery tasksGeneral Water Supply Description Initial Description InitialChilled Water Supply Description Initial Power Requirements Description Initial General Description InitialAppendix C Regulatory compliance notices Safety and IEC complianceHP POD 20c regulatory compliance Safety and regulatory compliance Warranty informationGlossary Uninterruptible power system Very early smoke detection apparatusDocumentation feedback Site assessment checklist 26 site pad IndexIndex