HP Performance Optimized Data Center (POD) 20cp manual Site assessment, Site preparation

Page 6

Feature

Specification

 

 

Class

Class1

Ambient temperature

2°C to 54°C (35.6°F to 129.2°F)

Relative humidity

0% to 100% humidity

As part of the overall certification, relevant sections of the International Building Code have been applied as part of the design and evaluation. The current design supports wind loads up to 144.84 kph (90 mph).

Site assessment

HP requires a detailed site assessment prior to planning and preparing the customer site location for the HP POD 20c. Consult with HP to schedule a site assessment.

Site preparation

Site preparation must be complete before the delivery of the POD for a timely installation and commissioning. The site must meet all pad, power, and chilled water requirements.

Site safety and security

Each customer site must have its own standard safety and security requirements. The HP Program Managers work with the customer to ensure adherence to the appropriate precautions. HP is not responsible for determining or enforcing safety or security requirements. The customer must conduct all health and safety evaluations of the HP POD 20c, only using HP as a support mechanism.

Fire detection and suppression

The fire suppression system, supplied as an optional component for the HP POD 20c, is a "Manufacturer Designed" system specifically designed for this HP product, in compliance with national standards.

The HP standard suppression system includes a Novec 1230 clean agent system. However, if the customer or local Authorities require specific modifications or a replacement, HP can assist in these actions at the expense of the customer.

HP does not certify that the fire suppression system that is installed in the HP POD 20c meets all local and jurisdictional requirements. The customer is responsible for the following actions as related to the fire suppression system:

Verifying that the POD suppression system meets local codes, including specific local requirements for initial and periodic inspections

Arranging for and receiving all required local permits, including initial commissioning as well as standard and repair maintenance

Arranging for the connection of the agent tanks, refilling of tanks, and all system testing, including pressure tests. All general maintenance of the suppression system must be completed by an authorized technician.

Additional local requirements are not covered as part of the option price or basic installation and deployment services, unless specifically included in an executed Statement of Work.

Overview 6

Image 6
Contents Abstract Part Number March EditionPage Contents Appendix a HP site assessment Safety and IEC compliance OverviewAbout this document Site assessment Site safety and securityFeature Specification Site preparationHP POD 20c capacity limitations Electrical power capacities critical IT powerHP POD 20c capacities Overall system capacitiesSite requirements HP POD 20c weightDimensions and clearances Site padSite requirements Future expansions Grounding requirements Utilities Humidifier water supplyFront view shown Requirement Location Specification DrainageChilled water supply Power infrastructure installation Piping materialsParameter Range Electrical power system configuration Site electrical systemAdditional POD connections Supported facility connectionsEnvironmental control system Connection portalsHumidifier End view shownHP POD 20c access control Fire, safety, and access notificationsFire box Demarcation box Supported facility connections Environmental risks Areas prone to lightning or power surgesEnvironmental considerations Cold weatherHP Site Preparation Drawing Package Site plan requirements and actionsCompleting a site assessment Zoning and permit requirementsHP POD 20c installation Site planningAssembly equipment locations Description HP POD 20c storage requirementsAdditional structures HP POD 20c site assessment checklist Appendix a HP site assessmentDescription Yes Initial Used as the basis for the evaluation. The delivery path isCustomer responsibilities Description Initial InformationAppendix B Preparing for delivery HP POD 20c site readiness checklistInstallation prerequisites Pre-delivery tasksDescription Initial General Water Supply Description InitialChilled Water Supply Description Initial Power Requirements Description Initial General Description InitialSafety and IEC compliance Appendix C Regulatory compliance noticesHP POD 20c regulatory compliance Safety and regulatory compliance Warranty informationGlossary Uninterruptible power system Very early smoke detection apparatusDocumentation feedback Site assessment checklist 26 site pad IndexIndex
Related manuals
Manual 86 pages 43.14 Kb Manual 22 pages 15.98 Kb Manual 81 pages 57.33 Kb Manual 37 pages 24.34 Kb