HP Performance Optimized Data Center (POD) 20cp manual Additional structures

Page 25

Additional structures

If a customer-provided vestibule or other structure is installed and connected to the HP POD 20c, the following specifications must be maintained:

To protect the HP POD 20c and ensure a waterproof barrier, flashing must be installed to the exterior of the HP POD 20c in the location where the other structure is attached.

Access landings might be required to maintain the required access to the HP POD 20c electrical panels.

Site plan requirements and actions 25

Image 25
Contents Part Number March Edition AbstractPage Contents Appendix a HP site assessment Overview Safety and IEC complianceAbout this document Feature Specification Site safety and securitySite assessment Site preparationHP POD 20c capacities Electrical power capacities critical IT powerHP POD 20c capacity limitations Overall system capacitiesDimensions and clearances HP POD 20c weightSite requirements Site padSite requirements Future expansions Grounding requirements Humidifier water supply UtilitiesFront view shown Drainage Requirement Location SpecificationChilled water supply Piping materials Power infrastructure installationParameter Range Site electrical system Electrical power system configurationEnvironmental control system Supported facility connectionsAdditional POD connections Connection portalsEnd view shown HumidifierFire, safety, and access notifications HP POD 20c access controlFire box Demarcation box Supported facility connections Environmental considerations Areas prone to lightning or power surgesEnvironmental risks Cold weatherCompleting a site assessment Site plan requirements and actionsHP Site Preparation Drawing Package Zoning and permit requirementsSite planning HP POD 20c installationHP POD 20c storage requirements Assembly equipment locations DescriptionAdditional structures Appendix a HP site assessment HP POD 20c site assessment checklistUsed as the basis for the evaluation. The delivery path is Description Yes InitialInformation Customer responsibilities Description InitialInstallation prerequisites HP POD 20c site readiness checklistAppendix B Preparing for delivery Pre-delivery tasksGeneral Water Supply Description Initial Description InitialChilled Water Supply Description Initial General Description Initial Power Requirements Description InitialAppendix C Regulatory compliance notices Safety and IEC complianceHP POD 20c regulatory compliance Warranty information Safety and regulatory complianceGlossary Very early smoke detection apparatus Uninterruptible power systemDocumentation feedback Index Site assessment checklist 26 site padIndex
Related manuals
Manual 86 pages 43.14 Kb Manual 22 pages 15.98 Kb Manual 81 pages 57.33 Kb Manual 37 pages 24.34 Kb