HP Performance Optimized Data Center (POD) 20cp manual Contents

Page 3

Contents

 

Overview

5

About this document

5

Safety and IEC compliance

5

Site assessment

6

Site preparation

6

Site safety and security

6

Fire detection and suppression

6

HP POD 20c capacities

7

HP POD 20c capacity limitations

7

Electrical power capacities (critical IT power)

7

Mechanical cooling capacities

7

Overall system capacities

7

Site requirements

8

Site pad

8

HP POD 20c weight

8

Dimensions and clearances

8

Future expansions

10

Grounding requirements

11

Utilities

12

Humidifier water supply

12

Drainage

13

Chilled water supply

13

Piping materials

14

Power infrastructure installation

14

Site electrical system

15

Electrical power system configuration

15

Supported facility connections

16

Environmental control system

16

Additional POD connections

16

Connection portals

16

Humidifier

17

HP POD 20c access control

18

Fire, safety, and access notifications

18

Fire box

18

Demarcation box

19

Environmental considerations

21

Environmental risks

21

Cold weather

21

Areas prone to lightning or power surges

21

Seismic activity

21

Site plan requirements and actions

22

Completing a site assessment

22

HP Site Preparation Drawing Package

22

Contents

3

Image 3
Contents Part Number March Edition AbstractPage Contents Appendix a HP site assessment Safety and IEC compliance OverviewAbout this document Site preparation Site safety and securityFeature Specification Site assessmentOverall system capacities Electrical power capacities critical IT powerHP POD 20c capacities HP POD 20c capacity limitationsSite pad HP POD 20c weightDimensions and clearances Site requirementsSite requirements Future expansions Grounding requirements Utilities Humidifier water supplyFront view shown Requirement Location Specification DrainageChilled water supply Power infrastructure installation Piping materialsParameter Range Site electrical system Electrical power system configurationConnection portals Supported facility connectionsEnvironmental control system Additional POD connectionsEnd view shown HumidifierHP POD 20c access control Fire, safety, and access notificationsFire box Demarcation box Supported facility connections Cold weather Areas prone to lightning or power surgesEnvironmental considerations Environmental risksZoning and permit requirements Site plan requirements and actionsCompleting a site assessment HP Site Preparation Drawing PackageSite planning HP POD 20c installationHP POD 20c storage requirements Assembly equipment locations DescriptionAdditional structures Appendix a HP site assessment HP POD 20c site assessment checklistUsed as the basis for the evaluation. The delivery path is Description Yes InitialInformation Customer responsibilities Description InitialPre-delivery tasks HP POD 20c site readiness checklistInstallation prerequisites Appendix B Preparing for deliveryDescription Initial General Water Supply Description InitialChilled Water Supply Description Initial General Description Initial Power Requirements Description InitialSafety and IEC compliance Appendix C Regulatory compliance noticesHP POD 20c regulatory compliance Warranty information Safety and regulatory complianceGlossary Very early smoke detection apparatus Uninterruptible power systemDocumentation feedback Index Site assessment checklist 26 site padIndex
Related manuals
Manual 86 pages 43.14 Kb Manual 22 pages 15.98 Kb Manual 81 pages 57.33 Kb Manual 37 pages 24.34 Kb