HP Performance Optimized Data Center (POD) 20cp Index, Site assessment checklist 26 site pad

Page 37

Index

A

about this guide 5

areas prone to lightning or power surges 21 assembly 29

assembly area 23

C

capacity limitations 7 clearance area 8

cold weather considerations 21 communication connections 18, 19 connection portals 16 connections, additional 16 connections, facility 16

D

delivery considerations 29 dimensions 8

drainage 13

E

electrical power capacity 7 electrical system 15 environmental considerations 21 environmental control system (ECS) 16 environmental risks 21

equipment, installation 23

F

facility connections 16 fire and safety 18 fire suppression 6 future expansions 10

G

grounding requirements 11

H

HP site preparation drawing package 22

humidifier 12, 17

I

installation 23 installation equipment 23

L

lifting layout and requirements 23 lightning protection 21

M

materials, piping 14 mechanical cooling capacity 7 modifications, FCC notice 33

O

other objects 25 overview 5

P

permit requirements 22 piping materials 14

power infrastructure installation 14 power surges 21

pre-delivery 29

preparing for assembly 29 project coordination 22

R

regulatory compliance identification numbers 33 regulatory compliance notices 33

regulatory compliance, HP POD 20c 5, 32

S

safety information 6, 33

security 6, 18

 

seismic activity

21

site assessment

6, 22, 26

site assessment checklist 26 site pad 8

Index 37

Image 37
Contents Part Number March Edition AbstractPage Contents Appendix a HP site assessment Overview Safety and IEC complianceAbout this document Feature Specification Site safety and securitySite assessment Site preparationHP POD 20c capacities Electrical power capacities critical IT powerHP POD 20c capacity limitations Overall system capacitiesDimensions and clearances HP POD 20c weightSite requirements Site padSite requirements Future expansions Grounding requirements Humidifier water supply UtilitiesFront view shown Drainage Requirement Location SpecificationChilled water supply Piping materials Power infrastructure installationParameter Range Site electrical system Electrical power system configurationEnvironmental control system Supported facility connectionsAdditional POD connections Connection portalsEnd view shown HumidifierFire, safety, and access notifications HP POD 20c access controlFire box Demarcation box Supported facility connections Environmental considerations Areas prone to lightning or power surgesEnvironmental risks Cold weatherCompleting a site assessment Site plan requirements and actionsHP Site Preparation Drawing Package Zoning and permit requirementsSite planning HP POD 20c installationHP POD 20c storage requirements Assembly equipment locations DescriptionAdditional structures Appendix a HP site assessment HP POD 20c site assessment checklistUsed as the basis for the evaluation. The delivery path is Description Yes InitialInformation Customer responsibilities Description InitialInstallation prerequisites HP POD 20c site readiness checklistAppendix B Preparing for delivery Pre-delivery tasksGeneral Water Supply Description Initial Description InitialChilled Water Supply Description Initial General Description Initial Power Requirements Description InitialAppendix C Regulatory compliance notices Safety and IEC complianceHP POD 20c regulatory compliance Warranty information Safety and regulatory compliance Glossary Very early smoke detection apparatus Uninterruptible power systemDocumentation feedback Index Site assessment checklist 26 site padIndex
Related manuals
Manual 86 pages 43.14 Kb Manual 22 pages 15.98 Kb Manual 81 pages 57.33 Kb Manual 37 pages 24.34 Kb