HP POD 20c access control

The HP POD 20c is equipped with standard key lock hardware for each personnel entry door and external electrical cabinet. Each personnel entry door includes a door access contact that can be connected to the customer facility security system.

Additional options for controlled access include the following:

Electronic card reader

12-digit access control code keypad

Magnetic lock on each personnel access door and dynamic hot aisle door

Fire, safety, and access notifications

Dry contacts are provided to enable the connection between the HP POD 20c and the customer’s facility. If the HP POD 20c is connected to the customer facility systems, then the alarm conditions of the HP POD 20c can be detected by the facility systems.

It is your responsibility to facilitate these connections. HP can make these connections when specifically contracted to deliver these services and a Scope of Work has been drafted, reviewed, and signed for delivery services.

The customer must provide an independent connection for each system listed in the following table.

Alarm

Description

 

 

Fire prevention alarm

Smoke is detected in the HP POD 20c.

Fire suppression

The suppression system alarm is activated and gas is

system (optional)

dispersed to suppress a fire.

Access control

A door of the POD has been opened.

EPO

The EPO system is activated by manually pressing the

 

EPO button or by a thermal event, and the HP POD 20c

 

is shut down.

 

 

The electrical layout of the fire alarm system is described in the schematic drawing that is supplied with the HP Performance Optimized Datacenter 20c Site Drawing Package.

Fire box

The communication connections between the fire system and the HP POD 20c are made through the fire box.

Supported facility connections 18

Image 18
Contents Abstract Part Number March EditionPage Contents Appendix a HP site assessment Safety and IEC compliance OverviewAbout this document Site assessment Site safety and securityFeature Specification Site preparationHP POD 20c capacity limitations Electrical power capacities critical IT powerHP POD 20c capacities Overall system capacitiesSite requirements HP POD 20c weightDimensions and clearances Site padSite requirements Future expansions Grounding requirements Utilities Humidifier water supplyFront view shown Requirement Location Specification DrainageChilled water supply Power infrastructure installation Piping materialsParameter Range Electrical power system configuration Site electrical systemAdditional POD connections Supported facility connectionsEnvironmental control system Connection portalsHumidifier End view shownHP POD 20c access control Fire, safety, and access notificationsFire box Demarcation box Supported facility connections Environmental risks Areas prone to lightning or power surgesEnvironmental considerations Cold weatherHP Site Preparation Drawing Package Site plan requirements and actionsCompleting a site assessment Zoning and permit requirementsHP POD 20c installation Site planningAssembly equipment locations Description HP POD 20c storage requirementsAdditional structures HP POD 20c site assessment checklist Appendix a HP site assessmentDescription Yes Initial Used as the basis for the evaluation. The delivery path isCustomer responsibilities Description Initial InformationAppendix B Preparing for delivery HP POD 20c site readiness checklistInstallation prerequisites Pre-delivery tasksDescription Initial General Water Supply Description InitialChilled Water Supply Description Initial Power Requirements Description Initial General Description InitialSafety and IEC compliance Appendix C Regulatory compliance noticesHP POD 20c regulatory compliance Safety and regulatory compliance Warranty informationGlossary Uninterruptible power system Very early smoke detection apparatusDocumentation feedback Site assessment checklist 26 site pad IndexIndex
Related manuals
Manual 86 pages 43.14 Kb Manual 22 pages 15.98 Kb Manual 81 pages 57.33 Kb Manual 37 pages 24.34 Kb