Parameter

Range

 

 

Calcium hardness (CaCO3)

0–200 ppm

Magnesium hardness (CaCO3)

0–150 ppm

Copper (Cu)

< 0.20 ppm

Iron (Fe)

< 3.0 ppm

Aluminum (Al)

< 0.50 ppm

Sodium (Na)

0–1000 ppm

Silica (SiO2)

0–150 ppm

Zinc (Zn)

< 1.0 ppm

Manganese (Mn)

< 0.1 ppm

Phosphate Ortho- (PO4)

< 3 ppm

Bacteria

< 1000 CFU/ml

Suspended solids

< 10 ppm

If your water is out of range, consult a water quality expert.

The following table describes the chilled water system specifications for the HP POD 20c.

Feature

Specification

 

 

Facility input temperature to the HP POD

12º to 24ºC (55º to 75ºF)

20c

 

Max design pressure

1,034 kPa (150 psi)

HP POD 20c pressure drop

172.4 kPa (25 psi)

HP POD 20c water flow rate

454 lpm (120 gpm*)

Chilled water supply and return

Two DIN PN16 DN80 flanges

connections

 

Piping materials

Do not use the following interconnecting piping materials in a closed water system:

Oxidizing biocides

Aluminum components

Brass components with high levels of zinc

Non-stainless steel iron components

PVC

IMPORTANT: Even though some PVC grade piping materials are designed to handle the expected water pressure, the use of PVC materials should be reviewed and approved by the customer site engineers.

Power infrastructure installation

When determining the final location of the power connections, consider the following:

Distance between the facility utilities and the location of the HP POD 20c

Site requirements 14

Image 14
Contents Abstract Part Number March EditionPage Contents Appendix a HP site assessment About this document Safety and IEC complianceOverview Site assessment Site safety and securityFeature Specification Site preparationHP POD 20c capacity limitations Electrical power capacities critical IT powerHP POD 20c capacities Overall system capacitiesSite requirements HP POD 20c weightDimensions and clearances Site padSite requirements Future expansions Grounding requirements Front view shown UtilitiesHumidifier water supply Chilled water supply Requirement Location SpecificationDrainage Parameter Range Power infrastructure installationPiping materials Electrical power system configuration Site electrical systemAdditional POD connections Supported facility connectionsEnvironmental control system Connection portalsHumidifier End view shownFire box HP POD 20c access controlFire, safety, and access notifications Demarcation box Supported facility connections Environmental risks Areas prone to lightning or power surgesEnvironmental considerations Cold weatherHP Site Preparation Drawing Package Site plan requirements and actionsCompleting a site assessment Zoning and permit requirementsHP POD 20c installation Site planningAssembly equipment locations Description HP POD 20c storage requirementsAdditional structures HP POD 20c site assessment checklist Appendix a HP site assessmentDescription Yes Initial Used as the basis for the evaluation. The delivery path isCustomer responsibilities Description Initial InformationAppendix B Preparing for delivery HP POD 20c site readiness checklistInstallation prerequisites Pre-delivery tasksChilled Water Supply Description Initial Description InitialGeneral Water Supply Description Initial Power Requirements Description Initial General Description InitialHP POD 20c regulatory compliance Safety and IEC complianceAppendix C Regulatory compliance notices Safety and regulatory compliance Warranty informationGlossary Uninterruptible power system Very early smoke detection apparatusDocumentation feedback Site assessment checklist 26 site pad IndexIndex
Related manuals
Manual 86 pages 43.14 Kb Manual 22 pages 15.98 Kb Manual 81 pages 57.33 Kb Manual 37 pages 24.34 Kb