Appendix C: Regulatory compliance notices

HP POD 20c regulatory compliance

The HP POD 20c complies with the following regulatory standards.

Standard

Certification level

Standard title

 

 

 

IEC/EN

"Intertek Tested and

IEC/EN 60950—Standard for Safety Information Technology

60950

Certified"

Equipment, Part 1: General Requirements, Issue: 2006

 

 

IEC/EN 60950—Standard for Safety Information Technology

 

 

Equipment, Part 22: Equipment to be Installed Outdoors, Issue:

 

 

2006

 

 

 

IBC 2009

Designed to Comply

2009 International Building Code, © 2010 International Code

 

With the applicable

Council, Inc.

 

requirements

 

Safety and IEC compliance

The HP POD 20c is examined, tested, and found to be in compliance with IEC/EN 60950 Part 1 and Part 22 as an Information Technology Product. For more information, see "HP POD 20c regulatory compliance (on page 32)."

The HP POD 20c is not suitable for long-term human occupancy. The HP POD 20c is Listed as a Product that provides service access areas for periodic maintenance and service. These areas must be used only by owner-authorized and qualified personnel who are trained in the maintenance and service of the HP POD 20c components.

IMPORTANT: Before installing the HP POD 20c, consult your local Authorities for applicable regulations and to review site-specific location guidelines. If needed, obtain any necessary permits.

Additional considerations for safety and Electrical compliance are as follows:

The HP POD 20c is Certified as an Information Technology Product to IEC/EN 60950 Part 1 and Part 22.

The HP POD 20c is evaluated as a "non-inhabitable product" that provides "service access" areas for customer-authorized, qualified, and trained service personnel.

The electrical connections of the HP POD 20c are evaluated as feeder connections for connection to an existing facility, and are not suitable as "service entrance" for connection to the utility.

The HP POD 20c is designed for stationary installation outdoors in a Pollution Degree 3 environment, in restricted access locations, with field wiring terminals provided for permanent supply connections.

The HP POD 20c meets the following ratings.

Feature

Specification

 

 

Category

Rated Overvoltage Category III

Protection

Surge protection device

Appendix C: Regulatory compliance notices 32

Image 32
Contents Abstract Part Number March EditionPage Contents Appendix a HP site assessment About this document Safety and IEC complianceOverview Site safety and security Feature SpecificationSite assessment Site preparationElectrical power capacities critical IT power HP POD 20c capacitiesHP POD 20c capacity limitations Overall system capacitiesHP POD 20c weight Dimensions and clearancesSite requirements Site padSite requirements Future expansions Grounding requirements Front view shown UtilitiesHumidifier water supply Chilled water supply Requirement Location SpecificationDrainage Parameter Range Power infrastructure installationPiping materials Electrical power system configuration Site electrical systemSupported facility connections Environmental control systemAdditional POD connections Connection portalsHumidifier End view shownFire box HP POD 20c access controlFire, safety, and access notifications Demarcation box Supported facility connections Areas prone to lightning or power surges Environmental considerationsEnvironmental risks Cold weatherSite plan requirements and actions Completing a site assessmentHP Site Preparation Drawing Package Zoning and permit requirementsHP POD 20c installation Site planningAssembly equipment locations Description HP POD 20c storage requirementsAdditional structures HP POD 20c site assessment checklist Appendix a HP site assessmentDescription Yes Initial Used as the basis for the evaluation. The delivery path isCustomer responsibilities Description Initial InformationHP POD 20c site readiness checklist Installation prerequisitesAppendix B Preparing for delivery Pre-delivery tasksChilled Water Supply Description Initial Description InitialGeneral Water Supply Description Initial Power Requirements Description Initial General Description InitialHP POD 20c regulatory compliance Safety and IEC complianceAppendix C Regulatory compliance notices Safety and regulatory compliance Warranty informationGlossary Uninterruptible power system Very early smoke detection apparatusDocumentation feedback Site assessment checklist 26 site pad IndexIndex
Related manuals
Manual 86 pages 43.14 Kb Manual 22 pages 15.98 Kb Manual 81 pages 57.33 Kb Manual 37 pages 24.34 Kb