HP Performance Optimized Data Center (POD) 20cp manual HP POD 20c storage requirements

Page 24

Assembly equipment locations

Item

Description

 

 

1

Crane

2

Reach

3

Truck

4

Area clear for scissors lift and forklift

HP POD 20c lifting requirements

WARNING: The only approved method for lifting the HP POD 20c is the use of a spreader bar harness. Lifting an HP POD 20c in any other manner can cause damage to the HP POD 20c and void your warranty. The harness and lifting connections must be perpendicular to the lifting blocks.

HP POD 20c storage requirements

If the site is not ready for assembly and operation, determine a location for storage when creating the site plan.

CAUTION: The HP POD 20c must maintain 20% relative humidity to minimize condensation and oxidation within the HP POD 20c.

CAUTION: While being stored, the HP POD 20c must be kept in a level position even if stored on a trailer.

Changes in ambient temperatures can cause condensation in a non-operational HP POD 20c. If the HP POD 20c is placed in storage or is in non-operating mode for over 72 hours, HP recommends using one of the following methods to minimize condensation and oxidation within the HP POD 20c:

Desiccant unit

Desiccant material

Heater with a fan

Air conditioner with a heater strip

Consult with HP Services to determine the most effective method.

Site plan requirements and actions 24

Image 24
Contents Abstract Part Number March EditionPage Contents Appendix a HP site assessment Safety and IEC compliance OverviewAbout this document Site safety and security Feature SpecificationSite assessment Site preparationElectrical power capacities critical IT power HP POD 20c capacitiesHP POD 20c capacity limitations Overall system capacitiesHP POD 20c weight Dimensions and clearancesSite requirements Site padSite requirements Future expansions Grounding requirements Utilities Humidifier water supplyFront view shown Requirement Location Specification DrainageChilled water supply Power infrastructure installation Piping materialsParameter Range Electrical power system configuration Site electrical systemSupported facility connections Environmental control systemAdditional POD connections Connection portalsHumidifier End view shownHP POD 20c access control Fire, safety, and access notificationsFire box Demarcation box Supported facility connections Areas prone to lightning or power surges Environmental considerationsEnvironmental risks Cold weatherSite plan requirements and actions Completing a site assessmentHP Site Preparation Drawing Package Zoning and permit requirementsHP POD 20c installation Site planningAssembly equipment locations Description HP POD 20c storage requirementsAdditional structures HP POD 20c site assessment checklist Appendix a HP site assessmentDescription Yes Initial Used as the basis for the evaluation. The delivery path isCustomer responsibilities Description Initial InformationHP POD 20c site readiness checklist Installation prerequisitesAppendix B Preparing for delivery Pre-delivery tasksDescription Initial General Water Supply Description InitialChilled Water Supply Description Initial Power Requirements Description Initial General Description InitialSafety and IEC compliance Appendix C Regulatory compliance noticesHP POD 20c regulatory compliance Safety and regulatory compliance Warranty informationGlossary Uninterruptible power system Very early smoke detection apparatusDocumentation feedback Site assessment checklist 26 site pad IndexIndex