HP Performance Optimized Data Center (POD) 20cp manual Drainage, Chilled water supply

Page 13

Do not treat the water with softeners. Softeners can produce foam, which affects the operation of the unit.

Do not use well water, industrial water, water from cooling circuits, or water contaminated by any chemicals or bacteria.

Do not add potential irritants to the water, such as disinfectants or anti-corrosive compounds.

The manufacturer recommends installing an in-line filter for the water supply. It is your responsibility to determine if a filter should be installed, and if so, its location. The filter cannot be installed inside the HP POD 20c and must be compatible with the type of humidifier that is installed.

For more information, see the Operations and Maintenance Manual or the HP Performance Optimized Datacenter 20c Maintenance and Service Guide.

Drainage

Requirement

Location

Specification

 

 

 

Condensate drains

Hot aisle side (2)

3.18 cm (1.25 in) drain line and 26.5 lpm (7 gpm) max

Chill Water Header drains

Cold aisle side (2)

3.18 cm (1.25 in) drain line and 26.5 lpm (7 gpm) max

Humidifier drain

Cold aisle side (1)

3.18 cm (1.25 in) drain line and 26.5 lpm (7 gpm) max

Chilled water supply

The following are the water quality requirements and specifications:

Closed-loop water must not contain any lime scale deposits or loose debris.

The temperature of the chilled water supplied to the HP POD 20c must be 12ºC to 24ºC (55ºF to 75ºF).

CAUTION: Freezing water can cause a blockage and damage to the unit. In outside locations that are subject to freezing temperatures, an additive such as glycol might be necessary to lower the freezing point. However, since the heat transfer potential of water with glycol is lower, the HP POD 20c must be de-rated accordingly.

IMPORTANT: The chilled water system piping and heat exchangers must be drained completely, and then purged using compressed air when storing or transporting at or below freezing temperatures.

IMPORTANT: Operating the chilled water system at the higher end of the acceptable range decreases the overall thermal capacity of the POD.

Acceptable water quality specifications

Water must be maintained per the following acceptable water quality standards.

Parameter

Range

 

 

pH

8.0–10

Specific conductance at 25ºC (77ºF)

10–2500 µmhos

Alkalinity ("M" as CaCO3)

150–1000 ppm

Sulfur (SO4)

0–150 ppm

Chloride (Cl)

0–100 ppm

Hardness (CaCO3)

0–350 ppm

Site requirements 13

Image 13
Contents Part Number March Edition AbstractPage Contents Appendix a HP site assessment Overview Safety and IEC complianceAbout this document Feature Specification Site safety and securitySite assessment Site preparationHP POD 20c capacities Electrical power capacities critical IT powerHP POD 20c capacity limitations Overall system capacitiesDimensions and clearances HP POD 20c weightSite requirements Site padSite requirements Future expansions Grounding requirements Humidifier water supply UtilitiesFront view shown Drainage Requirement Location SpecificationChilled water supply Piping materials Power infrastructure installationParameter Range Site electrical system Electrical power system configurationEnvironmental control system Supported facility connectionsAdditional POD connections Connection portalsEnd view shown HumidifierFire, safety, and access notifications HP POD 20c access controlFire box Demarcation box Supported facility connections Environmental considerations Areas prone to lightning or power surgesEnvironmental risks Cold weatherCompleting a site assessment Site plan requirements and actionsHP Site Preparation Drawing Package Zoning and permit requirementsSite planning HP POD 20c installationHP POD 20c storage requirements Assembly equipment locations DescriptionAdditional structures Appendix a HP site assessment HP POD 20c site assessment checklistUsed as the basis for the evaluation. The delivery path is Description Yes InitialInformation Customer responsibilities Description InitialInstallation prerequisites HP POD 20c site readiness checklistAppendix B Preparing for delivery Pre-delivery tasksGeneral Water Supply Description Initial Description InitialChilled Water Supply Description Initial General Description Initial Power Requirements Description InitialAppendix C Regulatory compliance notices Safety and IEC complianceHP POD 20c regulatory compliance Warranty information Safety and regulatory complianceGlossary Very early smoke detection apparatus Uninterruptible power systemDocumentation feedback Index Site assessment checklist 26 site padIndex