Ensure that the site safety and security programs are properly administered.

Interface directly with the HP installation project manager to ensure clear lines of communication during the installation and commissioning processes.

Site planning

A comprehensive site plan assists with the site design (MEP) and ensures the best possible HP POD 20c installation process. When creating a site plan, consider the following information:

HP POD 20c site requirements detailed in this document

HP POD 20c site preparation drawing package

HP POD 20c readiness checklist ("HP POD 20c site readiness checklist" on page 29)

HP POD 20c installation (on page 23)

The HP team can assist you by answering questions and help to guiding you throughout the process.

HP POD 20c installation

HP POD 20c installation includes the following:

Installation equipment staging (on page 23)

HP POD 20c lifting layout (on page 23)

HP POD 20c storage requirements (on page 24)

Additional structures (on page 25)

Installation equipment staging

Staging for the following items must be identified and considered:

Truck and component staging

Installation equipment staging

Site traffic

Regulatory or local permits

HP POD 20c lifting layout

When preparing a site plan, identify where to place the HP POD 20c and the equipment that is used for assembly. The following figure shows an HP POD 20c assembly site and includes:

HP POD 20c location

Crane location

Site plan requirements and actions 23

Image 23
Contents Part Number March Edition AbstractPage Contents Appendix a HP site assessment About this document Safety and IEC complianceOverview Site preparation Site safety and securityFeature Specification Site assessmentOverall system capacities Electrical power capacities critical IT powerHP POD 20c capacities HP POD 20c capacity limitationsSite pad HP POD 20c weightDimensions and clearances Site requirementsSite requirements Future expansions Grounding requirements Front view shown UtilitiesHumidifier water supply Chilled water supply Requirement Location SpecificationDrainage Parameter Range Power infrastructure installationPiping materials Site electrical system Electrical power system configurationConnection portals Supported facility connectionsEnvironmental control system Additional POD connectionsEnd view shown HumidifierFire box HP POD 20c access controlFire, safety, and access notifications Demarcation box Supported facility connections Cold weather Areas prone to lightning or power surgesEnvironmental considerations Environmental risksZoning and permit requirements Site plan requirements and actionsCompleting a site assessment HP Site Preparation Drawing PackageSite planning HP POD 20c installationHP POD 20c storage requirements Assembly equipment locations DescriptionAdditional structures Appendix a HP site assessment HP POD 20c site assessment checklistUsed as the basis for the evaluation. The delivery path is Description Yes InitialInformation Customer responsibilities Description InitialPre-delivery tasks HP POD 20c site readiness checklistInstallation prerequisites Appendix B Preparing for deliveryChilled Water Supply Description Initial Description InitialGeneral Water Supply Description Initial General Description Initial Power Requirements Description InitialHP POD 20c regulatory compliance Safety and IEC complianceAppendix C Regulatory compliance notices Warranty information Safety and regulatory complianceGlossary Very early smoke detection apparatus Uninterruptible power systemDocumentation feedback Index Site assessment checklist 26 site padIndex