| Hickory Industries, Inc. | |
| INDEX |
|
I. INITAL STEPS | 4 | |
1. Placing the Machine | 4 | |
2. Assembling the Machine | 4 | |
3. Electrical Connection | 4 | |
4. Gas Connection | 4 | |
5. Venting | 4 | |
1.0 Installation Instructions | 5 | |
1.1 | General Information | 5 |
1.2 | Description of the Data Plate | 5 |
1.3 | Machine Drawings and Dimensions | 6 |
1.4 | Conversion and Adjustment Instructions | 7 |
1.6 | Adjustments and Verification for use with Natural Gas | 7 |
1.7 | Natural Gas Flow Table (Consumption) | 8 |
| 1.7.1 Volumetric Method to Verify the High Flame Setting, Mathematical | 8 |
1.8 | Orifice Diameters, Primary Air Intake Settings, and Pressure Regulators | 9 |
1.9 | Changing Gas Orifices | 10 |
| 1.9.1 Changing the Main Gas Orifice | 10 |
| 1.9.2 Changing the Pilot Gas Orifice | 11 |
1.10 | Checking the Connected Gas Pressure (Nominal Pressure) | 12 |
1.11 | Maintenance, Response to Technical Problems, and Solutions | 12 |
1.12 | Testing or Checking for Safety | 13 |
1.14 Description of the Electrical Connection | 14 | |
1.15 | Electrical Diagram | 14 |
1.16 | Parts List for N/ 45G | 15 |
1.17 Parts List explosion diagram | 17 | |
4900 Westside Avenue, North Bergen, New Jersey 07047 | N/45 Series Manual12/00 |
Tel: [201] | Page 2 of 38 |