Raypak 85, 120 manual Stainless steel, Field supplied, 013102

Page 30

Stainless Steel 3” Vent System1

US + CANADA

Vent System - Room Air independent Operation (Sealed Combustion Operation) - Fig. 12-14-15-17

Tab. 7

Vent System diameter

3”

 

Vent system material

Stainless steel

 

Two pipes vent adaptors (included with the boiler)

-

 

-

adaptor 80 mm > 3” (included with the boiler 1 pcs) for flue

-

 

-

adaptor 80 mm > 3” for intake air

Field supplied

 

Order No.

Combustion air intake vent material 3

Field supplied

 

Order No.

ULC/UL listed1

 

 

 

Stainless steel Vent material

 

 

 

45° elbow EqL = 2 ft / 0,6m

Field supplied

 

Order No.

90° elbow EqL = 3 ft / 0,9m

 

 

 

 

 

 

 

Bird Screen c/w Termination

Field supplied

 

Order No.

Venting support2 dia. 3”

Field supplied

 

Order No.

 

 

 

 

 

 

 

 

1stainless steel vent material must be ULC/UL listed, stainless steel AL29-4C®for category IV boilers. Sources FasNseal – Protech System Inc.

2Order Mounting Clip for each straight length of vent pipe installed, boiler can not support weight of vent system

3allowable material for combustion air ABS – CPVC – PVC or stainless steel

-Do not exceed maximum equivalent vent length.

-Always follow XPak Venting System Installation Instructions.

Stainless Steel Vent System1

US + CANADA

Vent System - Room Air Dependent Operation - Fig. 13-16-18

Tab. 8

Vent System diameter

3”

 

 

Vent system material

Stainless steel

 

 

Adaptor for room air dependent operation 3

 

013102

 

Order No.

 

adaptor 80 mm > 3” (included with the boiler 1 pcs)

-

 

-

 

ULC/UL listed1

 

 

 

 

Stainless steel Vent material

 

 

 

 

45° elbow EqL = 2 ft / 0,6m

Field supplied

 

Order No.

 

90° elbow EqL = 3 ft / 0,9m

 

 

 

 

 

 

 

 

 

 

Bird Screen c/w Termination

Field supplied

 

Order No.

 

Venting support2 dia. 3”

Field supplied

 

Order No.

 

1Stainless steel vent material must be ULC/UL listed, stainless steel AL29-4C®for category IV boilers. Sources FasNseal – Protech System Inc.

2Order Mounting Clip for each straight length of vent pipe installed, boiler can not support weight of vent system

3Provide a proper air opening in the room (size according indication pg. 7)

-Do not exceed maximum equivalent vent length.

-Always follow XPak Venting System Installation Instructions.

30

Image 30
Contents Page About these instructions About the XPakContents PAY Attention to These Terms Following instructions must be observedYou must also observe Observe these instructions for space heating water What to do if you smell gasObserve these instructions as general warnings Tools, materials and additional equipmentM E / T E M P E R a T U R E Relationships in Scalds General SafetyBefore Installation Water Time to Produce SeriousRegulations and Guidelines Operating Limits of the boilerIntroduction General layout FigAB C DE Technical Data XPak Recommended Minimum Service ClearancesBoiler Dimensions And Weight Max flues length de-rate less 2%Safety Devices Manual Handling Statement Mode of Operation AT RestXpak Internal Hydraulic Circuit FIG Mode of Operation Principle ComponentsPiping Connections FIG Dimensions and Connections Fig Scope of Delivery Boiler BOX Content Table Pos Parts Quantity PackagingPackaging and Transportation Transporting the BoilerInstallation Prepare Xpak LocationPrepare Xpak Xpak Piping Waterside Flow Primary Circuit Procedure SummaryBoiler with DHW Tank Pump DutyXpak Installation Diagrams Key for installation sample diagramsPage Page Gas Pipe Capacity for different pipe sizes Length Gas Volume Capacity Pipe feet Ft 3/hMaking the GAS Connection Equivalent length for pipe fittings in feetBoiler Template Fig All Air from Inside the Building room air All Air from Outdoor sealed combustionVent Systems Flue GAS SystemBoiler Supply Installations1 Canadian Installations2 Minimum Clearances from VENT/AIR Inlet TerminationVertical Coaxial Sealed Combustion Operation TWO Pipes Single Wall Room AIR Dependent Operation Stainless steel Field supplied013102 Description Diagram Drawing TWO Pipes Single Wall = total intake length = Connecting the Condensate Water Drain Electrical ConnectionsConnecting Thermostat External WiringExternal Wiring Limitations Appliance Terminal BlockTerminal Strip Details HighLow WAY Valve Wiring Connection Remote Control ConnectionOutdoor Sensor Connection Wiring Functional Diagram START-UP Procedure Are several steps involved in starting up the boilerCHECK/CONTROL Water Chemistry Freeze Protection When UsedCommissioning Heating SystemCheck Thermostat Circuits Testing for GAS LeaksInitial Lighting and Ignition Safety Shutoff Device Test Initial Flushing of the SystemWarranty Final ChecksInstructing the User Switching OFF Switching on the ApplianceReset Function START-UP and OperationIndicator Leds and Faults Green indicator LED FigRed indicator LED Fig For AL41 faults For alarm AL91CHECKS, Adjustments and Fault Finding External Faults CHECKING/ADJUSTING the Boiler FAN SpeedsGAS Valve Minimum Pressure Setting Installation FaultsBoiler Configuration Fault FindingReversed Polarity or Supply Fault Electrical ChecksSelecting the offset heating curve Fig Setting the Outdoor Reset Curve with Outdoor SensorProgrammable Timer DAY+NIGHT Type of Heat Request Standard212 194 176 158 140 122 104 Fault Codes Code Cause Alarm Type ActionServicing Instructions Replacement of ComponentsComponent Removal Procedure GeneralReturn Sensor Return Thermistor Fig Water Pressure Switch FigFlow Sensor Primary Thermistor Fig Printed Circuit Board FigBurner Fig Blocked Flue Pressure SWITCH/IGNITION Transformer FigFlue FAN & Mixer Fig Main Heat Exchanger FigCondensate Trap Removal Fig Flue Collector and Flue Thermostat Removal FigPropane GAS GAS Supply InstallationLPG Instructions GAS SupplyTechnical Data LPG Sequence of the Ignition System Exploded Diagrams 56a Xpak Drawing Call OUT Description Important Instructions for the Commonwealth of Massachusetts Limited Warranty Applicable Warranty PeriodsHOW to Make Warranty Claim START-UP Checklist for FAN-ASSISTED Raypak Products Your XPak serial number For future reference

120, 85 specifications

The Raypak 120,85 is a prominent model in the realm of pool and spa heating solutions, designed to deliver unmatched efficiency and performance. Renowned for its robust features and innovative technologies, the Raypak 120,85 stands out as a reliable choice for homeowners seeking to maintain the perfect water temperature in their pools and spas.

One of the primary characteristics of the Raypak 120,85 is its impressive heating capacity. With a total output of 120,000 BTUs, this heater quickly and efficiently warms up water, ensuring that users can enjoy comfortable swimming conditions regardless of the outdoor temperature. The 85 indicates its ability to deliver consistent performance even in cooler climates, making it an adaptable option for various geographical locations.

The Raypak 120,85 is equipped with a state-of-the-art, copper fin tube heat exchanger, which provides superior heat transfer efficiency. This technology enhances the heater's ability to warm water rapidly while maintaining energy efficiency. Additionally, the copper material is known for its durability and resistance to corrosion, ensuring a long lifespan for the heat exchanger.

Another key feature of the Raypak 120,85 is its electronic ignition system. This innovation eliminates the need for a standing pilot light, which not only saves energy but also enhances safety by reducing the risk of gas leaks associated with traditional ignition systems. The electronic ignition provides precise control, ensuring a reliable start each time.

The Raypak 120,85 also boasts a digital display control panel, allowing users to easily monitor and adjust the water temperature settings. This intuitive interface provides accurate readings and simplifies the operation, making it accessible for all users, regardless of their technical expertise.

Furthermore, this heater is designed with a compact footprint, making it suitable for a variety of installation spaces, whether it’s in a pool equipment area or near a spa. Its robust build quality and weather-resistant design ensure that it can withstand the elements, making it a durable and long-lasting investment.

In summary, the Raypak 120,85 combines advanced heating technology, robust construction, and user-friendly features. With its high BTU output, efficient heat exchanger, electronic ignition, and digital controls, it represents a top-tier option for anyone seeking reliable and effective heating solutions for pools and spas. Whether for leisure or relaxation, the Raypak 120,85 promises to deliver an optimal swimming experience, season after season.