Raypak 120, 85 manual START-UP Checklist for FAN-ASSISTED Raypak Products

Page 67

START-UP CHECKLIST FOR FAN-ASSISTED

RAYPAK PRODUCTS

This start-up checklist is to be completely filled out by the service technician starting up the Raypak Boiler for the first time. All information may be used for warranty purposes and to ensure that the installation is correct. Additionally this form will be used to record all equipment operation functions and required settings.

GASSUPPLYDATA

 

 

Regulator Model & Size

_________ /

CFH

Gas Line Size (in room)

____________

In. NPT

Length of Gas Line

____________

Eq Ft

Gas Shut-Off Valve Type

____________

 

( Ball, Lube cock)

 

 

Sediment Trap

____________

Y/N

Port

_______Std__

Full

VISUAL INSPECTION OF COMPONENTS

Verify inspection was done and condition of components are in good working order with a “yes”

Wiring Harness

_____________ Y/N

Burner/s (flame)

_____________ Y/N

Remote flame sense

_____________ Y/N

VENTING

 

Vent Size:___________

Stack Height:_____

Category: _________

sketch vent on reverse side ***

Vent Material:

__________________

Vent Termination Type:

__________________

Combustion Air Openings:

Low __________in2

Ventilation air

High _________ in2

EMISSIONSSETTINGSANDTESTINFORMATION(ATFULLFIRE)

Blower Pressure Setting

______________ In. WC

Supply Gas Pressure

______________ In. WC

Verify stable pressure static &

dynamic condition

Manifold Gas Pressure

_____________ In. WC

Tracking Pressure (clean filter) ______________In. WC

CLEARANCES

 

Front Clearance

_______________In.

Right Side Clearance

_______________In.

Left Side Clearance

_______________In.

Rear Clearance

_______________In.

Overhead Clearance

_______________In.

ELECTRICAL

 

Voltage Supply (VAC)

No Load______ Load_____

Voltage -24 VAC

_____________ VAC

Voltage Com to Ground

_____________ VAC

Operating Control Setting _____________deg F

Sketch plumbing on reverse side

WATER SUPPLY

Flow Rate in GPM or Delta T __________ If Avail

Measure flow rate at full fire

Number of Tanks and Size Qty____ ____ Gallons

Plumbing Size

_______________

Pump Size: _________ (boiler)

Pump HP: ________

Impeller trim____________

Pump Model________

Louvers __________________

Screens____________

Nominal Factory Recommended Settings

See manual or card tag

See manual or card tag

See manual or card tag

The following measurements must be obtained with a Combustion Analyzer.

NOX

_____________ PPM

Less than 20 PPM (If required by Certifying Agency)

Free Oxygen

_____________ %

See manual

CO

_____________ PPM

Less than 170 PPM

CO2

_____________ %

See manual

Model Number: ______________________________

***Note: draw venting with details, such as extractors, barometric dampers, blast dampers or draft inducers

Serial Number: _______________________________

Site Altitude Above Sea Level __________________Ft.

Job Name _______________________________________________________________________________________

Address _________________________________________________________________________________________

Physical Location of Boiler: Indoors______; Outdoors______; Ground Level______; Roof______; Below Grade______

Mechanical Contractor / Installer _______________________________________________________________________

Date and Time of Start-up _____________Print Name and Signature of Start-up Technician_________________________

Information must be faxed to: (805) 278-5471 in order to ensure warranty consideration Attn: Service Manager

67

Image 67
Contents Page About the XPak About these instructionsContents Following instructions must be observed PAY Attention to These TermsYou must also observe Tools, materials and additional equipment What to do if you smell gasObserve these instructions as general warnings Observe these instructions for space heating waterWater Time to Produce Serious General SafetyBefore Installation M E / T E M P E R a T U R E Relationships in ScaldsOperating Limits of the boiler Regulations and GuidelinesGeneral layout Fig IntroductionAB C DE Technical Data Max flues length de-rate less 2% Recommended Minimum Service ClearancesBoiler Dimensions And Weight XPakPrinciple Components Manual Handling Statement Mode of Operation AT RestXpak Internal Hydraulic Circuit FIG Mode of Operation Safety DevicesPiping Connections FIG Dimensions and Connections Fig Transporting the Boiler Boiler BOX Content Table Pos Parts Quantity PackagingPackaging and Transportation Scope of DeliveryPrepare Xpak Location InstallationPrepare Xpak Xpak Piping Pump Duty Procedure SummaryBoiler with DHW Tank Waterside Flow Primary CircuitKey for installation sample diagrams Xpak Installation DiagramsPage Page Equivalent length for pipe fittings in feet Length Gas Volume Capacity Pipe feet Ft 3/hMaking the GAS Connection Gas Pipe Capacity for different pipe sizesBoiler Template Fig All Air from Outdoor sealed combustion All Air from Inside the Building room airFlue GAS System Vent SystemsBoiler Supply Minimum Clearances from VENT/AIR Inlet Termination Installations1 Canadian Installations2Vertical Coaxial Sealed Combustion Operation TWO Pipes Single Wall Room AIR Dependent Operation Field supplied Stainless steel013102 Description Diagram Drawing TWO Pipes Single Wall = total intake length = Electrical Connections Connecting the Condensate Water DrainAppliance Terminal Block External WiringExternal Wiring Limitations Connecting ThermostatHigh Terminal Strip DetailsLow Remote Control Connection WAY Valve Wiring ConnectionOutdoor Sensor Connection Wiring Functional Diagram Are several steps involved in starting up the boiler START-UP ProcedureHeating System Freeze Protection When UsedCommissioning CHECK/CONTROL Water ChemistryInitial Flushing of the System Testing for GAS LeaksInitial Lighting and Ignition Safety Shutoff Device Test Check Thermostat CircuitsFinal Checks WarrantyInstructing the User START-UP and Operation Switching on the ApplianceReset Function Switching OFFGreen indicator LED Fig Indicator Leds and FaultsRed indicator LED Fig For alarm AL91 For AL41 faultsCHECKS, Adjustments and Fault Finding Installation Faults CHECKING/ADJUSTING the Boiler FAN SpeedsGAS Valve Minimum Pressure Setting External FaultsElectrical Checks Fault FindingReversed Polarity or Supply Fault Boiler ConfigurationType of Heat Request Standard Setting the Outdoor Reset Curve with Outdoor SensorProgrammable Timer DAY+NIGHT Selecting the offset heating curve Fig212 194 176 158 140 122 104 Code Cause Alarm Type Action Fault CodesGeneral Replacement of ComponentsComponent Removal Procedure Servicing InstructionsPrinted Circuit Board Fig Water Pressure Switch FigFlow Sensor Primary Thermistor Fig Return Sensor Return Thermistor FigMain Heat Exchanger Fig Blocked Flue Pressure SWITCH/IGNITION Transformer FigFlue FAN & Mixer Fig Burner FigFlue Collector and Flue Thermostat Removal Fig Condensate Trap Removal FigGAS Supply GAS Supply InstallationLPG Instructions Propane GASTechnical Data LPG Sequence of the Ignition System Exploded Diagrams 56a Xpak Drawing Call OUT Description Important Instructions for the Commonwealth of Massachusetts Applicable Warranty Periods Limited WarrantyHOW to Make Warranty Claim START-UP Checklist for FAN-ASSISTED Raypak Products Your XPak serial number For future reference

120, 85 specifications

The Raypak 120,85 is a prominent model in the realm of pool and spa heating solutions, designed to deliver unmatched efficiency and performance. Renowned for its robust features and innovative technologies, the Raypak 120,85 stands out as a reliable choice for homeowners seeking to maintain the perfect water temperature in their pools and spas.

One of the primary characteristics of the Raypak 120,85 is its impressive heating capacity. With a total output of 120,000 BTUs, this heater quickly and efficiently warms up water, ensuring that users can enjoy comfortable swimming conditions regardless of the outdoor temperature. The 85 indicates its ability to deliver consistent performance even in cooler climates, making it an adaptable option for various geographical locations.

The Raypak 120,85 is equipped with a state-of-the-art, copper fin tube heat exchanger, which provides superior heat transfer efficiency. This technology enhances the heater's ability to warm water rapidly while maintaining energy efficiency. Additionally, the copper material is known for its durability and resistance to corrosion, ensuring a long lifespan for the heat exchanger.

Another key feature of the Raypak 120,85 is its electronic ignition system. This innovation eliminates the need for a standing pilot light, which not only saves energy but also enhances safety by reducing the risk of gas leaks associated with traditional ignition systems. The electronic ignition provides precise control, ensuring a reliable start each time.

The Raypak 120,85 also boasts a digital display control panel, allowing users to easily monitor and adjust the water temperature settings. This intuitive interface provides accurate readings and simplifies the operation, making it accessible for all users, regardless of their technical expertise.

Furthermore, this heater is designed with a compact footprint, making it suitable for a variety of installation spaces, whether it’s in a pool equipment area or near a spa. Its robust build quality and weather-resistant design ensure that it can withstand the elements, making it a durable and long-lasting investment.

In summary, the Raypak 120,85 combines advanced heating technology, robust construction, and user-friendly features. With its high BTU output, efficient heat exchanger, electronic ignition, and digital controls, it represents a top-tier option for anyone seeking reliable and effective heating solutions for pools and spas. Whether for leisure or relaxation, the Raypak 120,85 promises to deliver an optimal swimming experience, season after season.