GE 5500 Wall Case with RAD10 Drain KIT, Rear Grille, Typical Installation, Wall Case Room Cabinet

Page 35

WALL CASE WITH RAD10 DRAIN KIT

EXTERNAL DRAIN

SEE PAGE 36 FOR INTERNAL DRAIN

SCREWS

“A” “B”

METAL PLASTIC

SEE PAGE 36 NOTE #6

SQUARE DRAIN HOLES

1/2" O.D. 90° ELBOW DRAIN TUBE

NEOPRENE SPONGE GASKET

STEEL MOUNTING PLATE

USE TYPE “A” SCREW FOR METAL CASE (RAB71)

AND TYPE “B” SCREW FOR MOLDED CASE (RAB77)

WATER DRAINAGE - Precipitation entering the unit through the outdoor louver may not be removed entirely by the condensate removal system. The base pan flange is designed to allow excess water, either condensate water or precipitation, to flow into the wall case and drain through two drain holes in the rear of the wall case. If there is more water in the wall case than can be drained through these holes it will drain through the three overflow drain holes. These drain holes must not be blocked when mounting or caulking the wall case.

Caulk around perimeter of wall case all four sides where it joins the building.

REAR

GRILLE

NOTE: SHADED PARTS AND

 

SCREWS ARE INCLUDED

 

WITH RAD10 DRAIN KIT.

Alternate

USE EITHER THE 90°

6" long, 1/2"

ELBOW TUBE OR THE

O.D. straight

STRAIGHT TUBE

copper tube.

DEPENDING UPON THE

 

REQUIREMENTS OF THE

 

PARTICULAR

 

INSTALLATION.

TYPICAL INSTALLATION

CASE ANGLES (FIELD SUPPLIED)

WALL CASE

ROOM

CABINET

35

For those installations where water draining from the drain holes is objectionable or where positive drainage is desired, the RAD10 drain kit is available with either a 90° elbow or a 6” straight tube to be used either to connect to a field supplied drain line or to allow the water to drip free rather than drain down the surface of the building.

NOTE: Drain kit using either the 90° elbow tube or the straight tube may be installed without modification when using RAG60 exterior grille. Drain kit using the 90° elbow tube may be installed without modification when using RAG61 through RAG66 exterior grilles. Modification must be made to the RAG61 through RAG66 exterior grilles when using the straight tube. Modification must be made to the RAG67 grille if using either the 90° elbow tube or the straight tube (see installation instructions with the RAG67 grille).

90° ELBOW DRAIN TUBE

PROJECTION 3"

BEYOND WALL 4" CASE

MIN. 2 SUPPORTS

FLOOR

FIELD SUPPLIED

 

Image 35
Contents Architects and Engineers Design Data Manual Series Cooling with Electric Heat Series Heat Pump with Backup Resistance HeatQuick Reference 3500 Series Control PanelEER COP Series Control PanelNewest Innovation from GE Cooling With Resistance HeatImportant Notice Table of ContentsIntroduction Deluxe Series shown Optional Accessories of the Zoneline SystemComponents of the Zoneline System UPC Zoneline Features Model SeriesFeatures and Benefits Electronic Temperature Limiting Fan Only Setting HIGH/LOWFan Cycle Switch SmartFan Compressor Restart DelayCorrosion Protection Optional Easy Clean Air Discharge AreaUp-Front Air Filters Concealed Manual Vent Control3500 Series Auxiliary Control SwitchesCooling Temperature Limits Heating Temperature LimitsDiagnos SeriesCentral Desk Control Resistance Heat Models Remote Thermostat ControlHeat Pump Models RAK806 Universal Control Cover LabelSee RAK806 Universal Control cover Label on Feature SeriesSpecial order, 100 piece minimum order For Use With Mechanical 4-Wire Systems OnlyRemote Control Low Voltage Wiring R1, R2, and R3Heat pump condensate Heat Pumps and Energy SavingsBalance Point Zoneline 5500 Series Heat Source Logic Heat pump defrost Zoneline 5500 SeriesHeat Pump Operation Zoneline 5500 Series High Wall Mount For units Application CommentsAir Distribution RecommendationDimensions RAK204 Wall CaseSub-Base General Wall Case Installation DataWindow, Curtain and Panel Wall Construction Preparation of the Wall Case for All Types of Construction Installation of Wall Case in Wall OpeningMasonry Wall Construction Brick, Frame, Stucco and Shingle ConstructionFastening Wall Case Framing for Wall CaseRoom Wall Case Cabinet Wall Section Detailed Side ViewRoom Cabinet Wall CaseBy Others RoomCabinet Wall Case Wall Case ReceptacleCaulk Wall Case Installation Cord SET ConnectedCorner and lap joints be additionally sealed Page TOP View Recommend 2 to Adjustable CaulkHoles by Installer Shown with Access Covers Removed Alternates SmallMetal Case Screw Clip Type D Type a To Secure Side Channels RAK204 Series SUB-BASE Installation and Electrical DataChaseway Option Type B Screw Green GroundCooling Condensate Condensate Disposal SystemsWall Case Room Cabinet Typical InstallationWall Case with RAD10 Drain KIT Rear GrilleUSE Type a Screws for Both RAB71 and RAB77 NUT Molded Case RAB77 only DetailGasket Cabinet Bottom Tube Cover Plate Ducted Application Considerations Ducted InstallationsNew Ducted Installations Replacements of Existing Ducted UnitsDuct Adapter Extension has 1/2 Insulation Ducted Application AZ2500/3500 SeriesDucted Detailed Side Views AZ2500/3500 Series Sub-Base InstallationSample Calculations Exterior Grilles265 or 277 Volt Unit Installation Permanent Connected Units Power Connection For Deluxe Series 2500230/208 Volt Unit Installation Line Cord Connected Units 230/208 Volt Unit Installation Permanent Connected Units230/208 Volt Installations Power Connection Kits For Premium SeriesReplacement of Existing Chassis Maximum Connected Load For Deluxe Series 2500 Heat Pump Performance Data Cooling Performance DataLatent System Capacity Normal Yearly Operating Data Formula for Calculating Operating Costs Using Above DataDrive Board Unit Typical 2500 Series Wiring DiagramTypical 2500 Series Schematic Diagram Board Unit Typical 3500 Series Wiring DiagramTypical 3500 Series Schematic Diagram Typical 5500 Series Schematic Diagram Typical 5500 Series Wiring DiagramSuggested Bid Form Specifications Page Alternate specification for molded wall case Deluxe Line Dry Air 25 & 3500 Series Receptacles/Sub-Bases Kit Number Description For Additional Information Refer to Complete Accessory ListElectrical Wiring Installation General Installation SuggestionsReplacement Installations New InstallationsCategory Alphabetical IndexZoneline

5500 specifications

The GE 5500 is a sophisticated gas turbine that represents a benchmark in the realm of power generation technology. Known for its impressive performance and efficiency, the GE 5500 has garnered attention in various industries, particularly in energy production. Designed for combined-cycle applications, this turbine effectively leverages both gas and steam cycles to optimize electricity generation.

One of the standout features of the GE 5500 is its advanced aerodynamics, which enhance the efficiency of the combustion process. The turbine employs state-of-the-art combustion technology that allows for high operational flexibility and minimizes emissions, meeting stringent environmental standards. This is particularly important in today’s energy landscape, where sustainability is a crucial focus.

The GE 5500 is equipped with a robust control system that utilizes digital twin technology. This innovative approach allows operators to simulate and analyze the performance of the turbine virtually, leading to improved operational efficiency and reduced downtime. Additionally, this turbine features an integrated health monitoring system that provides real-time data on performance metrics, allowing for predictive maintenance and enhancing overall reliability.

The materials used in the construction of the GE 5500 are engineered to withstand high temperatures and stress levels, ensuring longevity and durability. This includes high-performance alloys that maintain structural integrity even under extreme operating conditions.

Installation and maintenance of the GE 5500 are streamlined through its modular design, which simplifies access to components and reduces service time. This efficiency translates into lower operational costs, making the GE 5500 an economically favorable choice for utilities and independent power producers.

Furthermore, the GE 5500 can be integrated into a variety of power plant configurations, whether for peaking power or baseload operations, which adds to its versatility. Its ability to quickly ramp up production makes it particularly valuable in an energy market characterized by fluctuating demand.

Overall, the GE 5500 gas turbine is a remarkable engineering feat that combines cutting-edge technology with practical design. Its efficiency, reliability, and adaptability position it as a leading choice for power generation needs, meeting the requirements of modern energy systems while contributing to a more sustainable future.